首页> 外文会议>International Conference on Information Management, Innovation Management and Industrial Engineering;ICIII 2012 >Study on partner selection method for construction supply chain using tabu-search algorithm
【24h】

Study on partner selection method for construction supply chain using tabu-search algorithm

机译:基于禁忌搜索算法的建筑供应链合作伙伴选择方法研究

获取原文

摘要

In large construction projects, optimal confidence in partner selection is the key problem in order to ensure success of the project. Considering on the processing time of the sub-project and timing constrains between each other, we established the 0–1 integer programming model in order to implement the project within the optimal confidence and the optimize possibility of delays. For the dynamic redistribution of the candidate partners'' confidence level in different time slots, refer to the solving idea of “limit fixed time - resource leveling” scheduling problem, project scheduling algorithm is designed to evaluate the fitness of the feasible solution, and embed the project scheduling algorithm into tabu search algorithm on order to solve the model.
机译:在大型建设项目中,对合作伙伴选择的最佳信心是确保项目成功的关键问题。考虑到子项目的处理时间和彼此之间的时序约束,我们建立了0-1整数规划模型,以便在最佳置信度和延迟的最佳可能性内实施项目。对于候选合作伙伴的置信度在不同时隙中的动态重新分配,请参考“限制固定时间-资源均衡”调度问题的解决思路,设计项目调度算法评估可行解的适用性,并嵌入将项目调度算法转化为禁忌搜索算法,以求解模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号