【24h】

Mounting of by-pass disconnect switches on energized 138 kV and 230kV substation with barehand technique

机译:将旁路隔离开关安装在通电的138 ​​kV和230上徒手技术的kV变电站

获取原文

摘要

After the construction of 230 kV Barra do Peixe Substation in1993, in the site of the future hydroelectric power plant (450 MW),ELETRONORTE has modified and improved its facilities to perform betterservices to its customers. This paper shows the work developed toinstall in live line two disconnect switches in 330 kV and 138 kV, usingthe barehand method, without outage to the power flow. In this way,ELCTRONORTE could continue furnishing electrical energy to severalcities in western Brazil while doing the work. Special emphasis is givento the techniques developed for this service, which was done very closeto energized busbars. The authors show the training of the crew and thesafety of all the service that was carried out. They show the studiesrealized, the sequence of activities developed along the service andphotos of the service that resulted in the successful installation ofthe disconnect switches without any outages
机译:在230 kV Barra do Peixe变电站建成后 1993年,在未来的水力发电厂(450兆瓦)的所在地, ELETRONORTE对其设施进行了改进和改进,以使其表现更好 为客户提供服务。本文显示了开发用于 在火线中安装两个330 kV和138 kV隔离开关,使用 裸手方法,不会中断潮流。这样, ELCTRONORTE可以继续向几家公司提供电能 巴西西部的城市在做这项工作。特别强调 与为此服务开发的技术非常接近 到通电的母线。作者展示了机组人员的培训和培训。 所有服务的安全性。他们展示了研究 意识到,沿着服务发展的活动顺序和 导致成功安装的服务的照片 断开开关,无任何中断

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号