首页> 外文会议>Engineering Management Society, 2000. Proceedings of the 2000 IEEE >Multi-project support issues: cycle time and schedule effects whenpeople support multiple concurrent projects
【24h】

Multi-project support issues: cycle time and schedule effects whenpeople support multiple concurrent projects

机译:多项目支持问题:周期时间和进度影响人们支持多个并发项目

获取原文

摘要

In many companies, engineers often support multiple developmentprojects at the same time, with the belief that this will speed up timeto market. This paper examines this perception, and seeks to identifythe pros and cons of multi-project support in product development.Typical situations and factors of influence on product development cycletime are examined, with a focus on productivity issues. From a workflowand utilization perspective, the effects of multi-project tasking arethen analyzed, using both analytical approaches and data observations.The results are used to evaluate the typical impact on a projectschedule. The information provides insight into ways to increase theeffective utilization of resources, situations where multi-projectsupport can be beneficial, as well as situations where the effects ofconcurrent multi-project support are detrimental to time to market.Finally, an overview of methods to minimize the detrimental effects isprovided
机译:在许多公司中,工程师通常支持多重开发 同时进行项目,并相信这将加快时间 市场。本文研究了这种看法,并试图找出 产品开发中多项目支持的利弊。 典型情况和影响产品开发周期的因素 检查时间,重点是生产力问题。从工作流程 和利用角度来看,多项目任务的效果是 然后使用分析方法和数据观察进行分析。 结果用于评估对项目的典型影响 日程。该信息提供了增加方法的见解。 有效利用资源,多项目情况 支持可能是有益的,在某些情况下, 同时进行的多项目支持不利于产品上市时间。 最后,概述了最小化有害影响的方法。 假如

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号