首页> 外文会议>Fusion Engineering 2005, Twenty-First IEEE/NPS Symposium on >Development and Fabrication of New Accelerator Grid Modules for Ion Sources in the 80 keV Neutral Beam Lines for DIII-D
【24h】

Development and Fabrication of New Accelerator Grid Modules for Ion Sources in the 80 keV Neutral Beam Lines for DIII-D

机译:用于DIII-D的80 keV中性束线中用于离子源的新型加速器栅格模块的开发和制造

获取原文

摘要

In 2001, efforts commenced to develop the technology to fabricate new accelerator grid modules for the ion sources in the 80 keV neutral beam lines for DIII-D. This campaign arose after water leaks began occurring with increasing frequency in the molybdenum grid rails and stainless steel water bellows of the original grid modules, fabricated in the mid-1980s. Root causes of the damage were determined and operational adjustments were made to correct the problems, but the string of failures depleted the DIII-D program of its supply of spare grid rail modules. The program was unable to procure new grid rail modules from any commercial source, nor was it able to obtain the molybdenum grid rails needed in two of the four module types. Efforts were then focused on fabricating new molybdenum rails required to make all four module types as well as on developing the procedures to successfully braze together the molybdenum and stainless steel parts into modules. Producing the diamond-shaped cross-section plasma grid rails proved to be very difficult, and a parallel task was initiated to design a modified source grid module that would employ circular cross-section grid rails while maintaining the most critical parameters of the original design. The brazing development program produced procedures that yielded consistently successful brazes in all the joint types present in all the modules. The parts for new grid modules, including the new modules containing circular cross section plasma grids, were fabricated. The new brazing procedures were successfully utilized to produce four new plasma grid modules of the new design. These modules were installed in an ion source and tested to full power before being utilized in service at the end of the 2005 DIII-D experimental campaign. An overview of the ion source development program is presented and a summary of the performance of the ion source containing the new plasma grid modules is reported
机译:2001年,开始努力开发该技术,以制造用于DIII-D的80 keV中性束线中离子源的新型加速器栅极模块。这项运动是在1980年代中期开始制造的,最初的网格模块的钼网格导轨和不锈钢波纹管中的渗漏频率越来越高之后开始出现的。确定了损坏的根本原因,并进行了操作上的调整以纠正问题,但一连串的故障使DIII-D计划耗尽了备用电网导轨模块的供应。该程序无法从任何商业来源购买新的网格导轨模块,也无法获得四种模块类型中的两种所需的钼网格导轨。然后,工作重点放在制造所有四种模块类型所需的新钼轨上,并着手开发将钼和不锈钢零件成功钎焊到模块中的程序。生产菱形横截面的等离子网格栅栏非常困难,因此开始了一项并行任务,以设计一种改进的源网格模块,该模块将采用圆形横截面网格栅栏,同时保持原始设计的最关键参数。钎焊开发程序所产生的程序可在所有模块中存在的所有接头类型中产生始终如一的成功钎焊。制造了新的栅格模块的零件,包括包含圆形横截面等离子栅格的新模块。新的钎焊程序已成功用于生产四个新设计的新等离子栅模块。这些模块已安装在离子源中,并经过了全功率测试,然后在2005年DIII-D实验计划结束时投入使用。介绍了离子源开发程序的概述,并报告了包含新等离子体栅模块的离子源的性能摘要

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号