首页> 外文会议>AEIT International Annual Conference >Risk assessment and control in protection against indirect contacts for Medium Voltage earth faults in open-cast mines and quarries
【24h】

Risk assessment and control in protection against indirect contacts for Medium Voltage earth faults in open-cast mines and quarries

机译:露天矿山和采石场中压接地故障的间接保护风险评估和控制

获取原文

摘要

Open-cast mines and quarries often use high power electrical machinery to extract materials from the site they are located. Due to the power of machinery, these activities require a MV electricity supply. They are very often located in sites where the soil has high resistivity, and it couldn’t be easy to guarantee the protection against indirect contacts according to EN 50522:2010-11 provisions. This is particularly true along the excavation front. The electrical properties of the soil on which the machinery are installed may change quickly and so changes the distribution of the potentials during MV earth faults. Risk control based on touch voltages measurements could not be a reliable technique; better to search structural solutions to guarantee the worker’s protection. The requirements of the EN 50522:2010-11 standard are evaluated not only under the electrical point of view, but keeping in mind the particular context. A metal mesh laid along the operating locations and connected to the metal chassis of the machinery is a simple and reliable solution. Measures executed in Italian quarries confirm this.
机译:露天矿山和采石场经常使用大功率电机从其所在地提取材料。由于机器的力量,这些活动需要中压电力供应。它们通常位于土壤具有高电阻率的位置,根据EN 50522:2010-11的规定,要保护其免受间接接触的保护并不容易。沿开挖前沿尤其如此。安装机器的土壤的电学特性可能会快速变化,因此会在MV接地故障期间改变电势的分布。基于触摸电压测量的风险控制可能不是一种可靠的技术。更好地寻找结构性解决方案来保证工人的保护。 EN 50522:2010-11标准的要求不仅在电气角度进行评估,而且要牢记特定的环境。沿着操作位置放置并连接到机器的金属底盘的金属网是一种简单而可靠的解决方案。意大利采石场执行的措施证实了这一点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号