首页> 外文会议>IEEE/IAS Industrial and Commercial Power System Asia >Integrated Generation-Grid-Load Economic Dispatch Considering Demand Response
【24h】

Integrated Generation-Grid-Load Economic Dispatch Considering Demand Response

机译:考虑需求响应的综合发电-电网负荷经济调度

获取原文

摘要

In response to the wind curtailment problem with the increasing large-scale wind power integration, the integrated generation-grid-load economic dispatch method considering demand response is proposed in this paper. Through integration of the optimization of power grid structure and load side demand response into the traditional power generation economic dispatch model, the flexibility resources of generation-grid-load sides in power systems are mobilized to promote large-scale wind power integration consumption. The proposed integrated generation-grid-load economic dispatch mathematical model is transformed into a mixed integer programming model through introduction of the big M method. The analysis of practical examples indicates that the proposed integrated generation-grid-load economic dispatch considering demand response can reduce wind power curtailment and improve the economy of power system operation.
机译:针对大规模风电一体化发展带来的风电削减问题,提出了一种考虑需求响应的发电-电网-负荷经济调度综合方法。通过将优化的电网结构和负荷侧需求响应整合到传统的发电经济调度模型中,调动了电力系统中发电-负荷侧的灵活性资源,以促进大规模的风电整合消耗。通过引入大M方法,将拟议的发电-电网-负荷经济调度数学模型转换为混合整数规划模型。实例分析表明,所提出的考虑需求响应的发电-电网-负荷经济调度可以减少风电削减,提高电力系统运行的经济性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号