A Bus Transfer is a process of enabling power continuity to unit motor bus during unit startup, shutdown, maintenance and contingency condition by successful changeover of sources. The field of live Bus Transfer has undergone rapid change in the past two decades due to rapid integration of computer based system in relaying and power system protection. This paper highlight implementation of problem experienced in power plant motor bus transfer system during load throw-off condition and due to breaker mal function; the above problem has been analyzed, solution has been implemented and tested.
机译:总线传输是通过成功切换电源,在设备启动,关闭,维护和应急情况下,使设备电动机总线的电源连续性的过程。在过去的二十年中,由于基于计算机的系统在继电器和电力系统保护中的快速集成,实时总线传输领域发生了迅速的变化。本文着重介绍了在甩负荷情况下以及断路器故障引起的电厂电动机母线传输系统中遇到的问题的实现;以上问题已得到分析,解决方案已得到实施和测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号