【24h】

Modelling of Longwall Coal Mining

机译:长壁采煤建模

获取原文

摘要

Increasing the productivity of longwall coal mining in underground mining of thick methane-bearing coal seams is an important problem. To solve this problem a mathematical model and a simulation model of the longwall coal mining operation were developed. The main goal of the modelling of coal mining operations in a fully-mechanized stoping face is the optimization of the longwall coal mining operations, the evaluation of productivity of a drum shearer depending on such factors as technical parameters of the drum shearer, size of a longwall face, flow charts of the drum shearer operation, changing characteristics of the coal seam. As a result of simulation the dependences of the drum shearer productivity on the length of the longwall face and flow charts of the drum shearer operation such as one-way flow chart, shuttle flow chart and bench flow chart were obtained. 2D and 3D visualizations of the execution of the simulation model were realized.
机译:在厚层含甲烷煤层的地下开采中,长壁采煤生产率的提高是一个重要的问题。为了解决这个问题,建立了长壁采煤作业的数学模型和仿真模型。综采工作面煤炭开采作业建模的主要目标是优化长壁采煤作业,根据滚筒采煤机的技术参数,选矿设备的尺寸等因素对滚筒采煤机的生产率进行评估。长壁工作面,鼓式采煤机运行流程图,变化的煤层特征。作为仿真的结果,获得了鼓式采煤机生产率对长壁工作面长度的依赖性以及鼓式采煤机操作流程图,例如单向流程图,往复式流程图和台式流程图。实现了仿真模型执行的2D和3D可视化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号