首页> 外文会议>Electrical Insulation Conference >A Problematic Field Experience Using Surge Testing
【24h】

A Problematic Field Experience Using Surge Testing

机译:使用电涌测试产生问题的现场经验

获取原文

摘要

Surge testing of stator windings has long been used as part of incoming testing for inspections and documentation for machines with periodic maintenance plans. While IEEE 522 and IEC 60034–15 offer some guidance for performing the test on windings and windings which have been aged, neither offers acceptable results when comparing resulting wave forms from different phases or technical explanations to problems. It is known steep front rise time surge comparisons only applies electrical stress the first few turns of the first coil or coils in a phase and may not be useful in checking the dielectric performance past the first coil. This paper will explain an experience which surge comparison was used as part of an incoming test plan, the questionable comparison results, the issue, remediation, corrected results, and a proposal for suggested acceptable separation of resulting waveform between phases
机译:长期以来,定子绕组的浪涌测试一直作为传入测试的一部分,用于定期维护计划的机器的检查和文档记录。尽管IEEE 522和IEC 60034-15为在已老化的绕组上进行测试提供了一些指导,但是在比较不同相位或技术解释所产生的波形到问题时,都无法提供可接受的结果。已知陡峭的前上升时间浪涌比较仅在相中的一个或多个第一线圈的前几匝中施加电应力,并且在检查经过第一线圈的介电性能方面可能没有用。本文将解释将电涌比较用作输入测试计划的一部分的经验,比较结果可疑的问题,问题,补救措施,更正的结果,以及提出建议的建议的相分离结果,建议将这些相分离

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号