首页> 外文会议>International Conference on Industrial Engineering, Applications and Manufacturing >Maneuverability Requirements to Gas-Turbine and Gas-Piston Generator Sets
【24h】

Maneuverability Requirements to Gas-Turbine and Gas-Piston Generator Sets

机译:燃气轮机和燃气活塞发电机组的机动性要求

获取原文

摘要

Distributed-generation (DG) facilities widely employ gas-turbine (GTU) and gas-piston (GPU) generator sets (GS) capable of islanded operation or running in parallel with the grid. This paper considers various operating conditions that may cause significant GS load throw and load-shedding that entails disconnecting and subsequent consumer power outage. Analysis reveals which GTU/GPU design features may result in damage and/or outage if the unit is exposed to external disturbances in the adjacent grid. It also demonstrates the efficiency of comprehensive solutions that use energy storage and variable-frequency motor-based drives to prevent GS damage and/or outage. Besides, the paper substantiates the need of, and proposes DG GS maneuverability requirements for more efficient use.
机译:分布式发电(DG)设施广泛采用能够独立运行或与电网并行运行的燃气轮机(GTU)和燃气活塞(GPU)发电机组(GS)。本文考虑了可能导致大量GS负载抛出和负载下降的各种运行条件,这些负载和负载损耗会导致断开连接和随后的用户用电中断。分析表明,如果单元受到相邻电网的外部干扰,哪些GTU / GPU设计功能可能会导致损坏和/或断电。它还展示了使用能量存储和基于变频电动机的驱动器来防止GS损坏和/或停机的综合解决方案的效率。此外,本文进一步证实了DG GS的可操作性要求,并提出了更高的使用效率要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号