Erie County Industrial Development Agency (ECIDA), Bethlehem Steel Rail Improvements Phase II Project: Overcoming Challenges Associated with the Localized HDPE Lining of A 54 Inch Diameter Pressurized Waterline for Cooper E80 Loading

机译:伊利县工业发展局(ECIDA),伯利恒钢轨改进二期项目:克服与Cooper E80装料的54英寸直径加压水线的局部HDPE衬里相关的挑战

获取原文

摘要

The EClDA's Bethlehem Steel Rail Improvements Phase II Project located in Lackawanna, NY recently completed relocation of existing trackage on the 1,100-acre former Bethlehem Steel Plant site as part of the agency's revitalization plan. Track work consisted of retiring an existing rail yard, rehabilitation of an existing yard to restore lost storage capacity and construction of a new 2,200-foot track to improve rail operations on the site. Design and construction of the new track proved itself challenging given the corridor traverses a 54-inch diameter watermain which is oriented longitudinally and would require protection for the new track to pass over it as it was not built to withstand railroad loading. The project to protect the watermain was initially bid proposing to use split steel casing. All bids received exceeded the estimate and were dismissed. Stakeholders had the design team investigate use of internal lining systems commonly used to strengthen and rehabilitate gravity sewers and stormwater culverts. Lining systems like this while common for non-pressurized (gravity) lines, their use in pressurized environments is still in the infancy stages and much less common for watermains of this diameter. Plans developed offered interested bidders the option of using either a Cured In-Place Pipe (CIPP) liner or a High-Density Polyethylene (HDPE) liner. A lone contractor submitted a bid opting to install an HDPE liner. Though the HDPE liner was selected as the contractor's preferred method, there was still an extensive amount of collaboration required for the project to be successfully completed.
机译:ECIDA位于纽约州拉克万纳的伯利恒钢轨改善第二阶段项目最近完成了搬迁,搬迁面积为1100英亩,位于伯利恒前钢铁厂旧址上,这是该机构振兴计划的一部分。轨道工作包括退役现有的铁路场,修复现有的场以恢复失去的存储能力以及建造新的2200英尺的轨道以改善现场的铁路运营。考虑到走廊横穿直径为54英寸的水管,水管纵向定位,因此新轨道的设计和施工本身就具有挑战性,因为它不是为承受铁路负荷而建造的,因此需要对新轨道进行保护。保护水管的项目最初是提议使用分体式钢制套管的投标。收到的所有投标都超出了估计,因此被驳回。利益相关者让设计团队调查内部衬砌系统的使用,这些内部衬砌系统通常用于加固和修复重力下水道和雨水涵洞。像这样的衬里系统虽然在非加压(重力)管线中很常见,但它们在加压环境中的使用仍处于婴儿期,而对于这种直径的水管来说则很少见。制定的计划为感兴趣的投标人提供了使用现场固化管道(CIPP)衬里或高密度聚乙烯(HDPE)衬里的选择。一个单独的承包商提交了一份投标书,选择安装HDPE衬管。尽管选择HDPE衬板作为承包商的首选方法,但要成功完成该项目,仍然需要大量的协作。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号