Development of the Benin, Togo and Ghana power interconnection network model at horizon 2022

机译:在2022年之前开发贝宁,多哥和加纳的电力互连网络模型

获取原文

摘要

This paper presents the current status of Benin, Togo and Ghana interconnection power network. After the assessment of the production and transmission infrastructures of the area as well as the supply and demand situation, the data forecasting were presented until 2022. These data permitted to draw the future power network by 2022 using the CYME software Version v8.2. The model realized allowed, through several hypotheses and various analyzes, to study the behavior of the network mainly the stability in small signals, the stability in frequency and the dynamic stability under the conditions of maximum loads with illustrations by extracted curves from the simulation software. These curves confirm that under the condition that the planned production infrastructure projects by the States are at least 50% completed, the power grid of the three countries, will, in all respects, remain in a stable state.
机译:本文介绍了贝宁,多哥和加纳的互联电网的现状。在评估了该地区的生产和输电基础设施以及供需状况之后,对数据进行了预测,直到2022年。这些数据允许使用CYME软件v8.2版在2022年之前绘制未来的电力网络。所实现的模型可以通过几个假设和各种分析,来研究网络的行为,主要是在小信号下的稳定性,在最大负载条件下的频率稳定性和动态稳定性,并通过从仿真软件中提取的曲线图进行说明。这些曲线证实,在国家计划的生产基础设施项目至少完成50%的条件下,这三个国家的电网将在所有方面保持稳定状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号