首页> 外文会议>Arctic day >Naval Surface Warfare Center Dahlgren Division
【24h】

Naval Surface Warfare Center Dahlgren Division

机译:海军水面作战中心达尔格伦分部

获取原文
获取外文期刊封面目录资料

摘要

Step 1 Task - Develop measurable contractual specification language as inputs to the Polar Security Cutter (PSC) Specifications for the Request For Proposal (RFP) 1. Goal: Ensure that human performance requirements are included in the design process Step 2 Task - Conduct pre-design analysis to prepare a range of design solutions for the PSC Bridge, Aloft Conn, and Helicopter Control Station (HCS), acting concurrently with vendor RFP design 2. Goal: Document operator and maintainer needs for a PSC and develop notional space layouts that optimize those needs, so that after contract award, adjustments to the awarded ship design can be recommended in a timely and cost effective manner.
机译:步骤1任务-开发可衡量的合同规范语言,作为对征求建议书(RFP)的Polar Security Cutter(PSC)规范的输入。1.目标:确保在设计过程中包括人员绩效要求。步骤2任务-进行预先设计设计分析,以为PSC桥,Aloft Conn和直升机控制站(HCS)准备一系列设计解决方案,同时与供应商RFP设计2一起起作用。目标:文档操作员和维护者对PSC的需求,并开发可优化的概念性空间布局这些需求,因此在授予合同后,可以及时,经济地建议对授予的船舶设计进行调整。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号