Step 1 Task - Develop measurable contractual specification language as inputs to the Polar Security Cutter (PSC) Specifications for the Request For Proposal (RFP) 1. Goal: Ensure that human performance requirements are included in the design process Step 2 Task - Conduct pre-design analysis to prepare a range of design solutions for the PSC Bridge, Aloft Conn, and Helicopter Control Station (HCS), acting concurrently with vendor RFP design 2. Goal: Document operator and maintainer needs for a PSC and develop notional space layouts that optimize those needs, so that after contract award, adjustments to the awarded ship design can be recommended in a timely and cost effective manner.
展开▼