Maintenance Scheduling of Distribution Reclosers Using RCM Techniques

机译:使用RCM技术的配电重合器的维护计划

获取原文

摘要

At present, the maintenance of most reclosers uses time-based maintenance (TBM) strategies due to its easy plan for the maintenance schedule. However, the maintenance of such strategies is a relatively high cost due to unnecessary and redundant maintenance activities. Moreover, TBM cannot prevent some failure modes resulting in malfunctions before the maintenance cycle. To solve the above-mentioned problems, this paper presents a method of determining the maintenance scheduling of the reclosers using reliability-centered maintenance (RCM). The RCM is a way to define the maintenance schedule according to the critical level of each recloser by considering the results of the condition assessment, together with the importance of the reclosers. The 9-condition assessment criteria and the 2-importance assessment criteria have been established. The proposed method is applied to the distribution reclosers from the Phitsanulok 3 substation of the Provincial Electricity Authority (PEA). It is found from the study results that the proposed method provides the critical level of each recloser, the maintenance schedule can be grouped and set up appropriately.
机译:目前,大多数重合闸的维护都采用基于时间的维护(TBM)策略,这是因为它易于制定维护计划。但是,由于不必要和多余的维护活动,维护此类策略的成本相对较高。此外,TBM无法防止某些故障模式导致维护周期之前的故障。为了解决上述问题,本文提出了一种以可靠性为中心的维护(RCM)确定重合器维护计划的方法。 RCM是一种通过考虑状态评估的结果以及重合器的重要性,根据每个重合器的关键级别定义维护计划的方法。已经建立了9个条件评估标准和2个重要性评估标准。该方法适用于省电力局(PEA)彭世洛3变电站的配电开关。从研究结果中发现,所提出的方法提供了每个重合器的临界水平,可以对维护计划进行分组和适当地设置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号