首页> 外文会议>Smart City Symposium Prague >Smart Grids and Software Testing Process Models
【24h】

Smart Grids and Software Testing Process Models

机译:智能电网和软件测试过程模型

获取原文

摘要

A Smart Grid (SG) is a Cyber–Physical System (CPS) idealized with the ultimate goal to reach optimal energy efficiency, a key enabler for the Smart City concept. SG reliability needs to be ensured by an in-depth testing process, involving software/ hardware components, network communication, together with quality concerns such as security of the overall infrastructure. While there are many models for modelling/designing SGs (e.g., SGAM), there is no specific testing process model customized for the SGs needs. As such, the aim of this paper is to identify a set of software testing process models developed over the years and investigate their adaptability to SG testing requirements. To reach the goal, we categorize SG requirements from related works with the help of a concept map. Afterwards, the most popular testing process models from literature are discussed in the context of the identified requirements. From a list of 17 main testing models, six testing models (TPI Next, TMMi, Test SPICE, TIM, ISO/IEC/IEEE 29119, and MTPF) are considered as potentially adaptable to the SG domain.
机译:智能电网(SG)是理想的网络物理系统(CPS),其最终目标是实现最佳的能源效率,这是智能城市概念的关键推动力。 SG可靠性需要通过深入的测试过程来确保,该过程涉及软件/硬件组件,网络通信以及质量问题,例如整个基础结构的安全性。尽管有许多用于SG建模/设计的模型(例如SGAM),但没有针对SG需求定制的特定测试过程模型。因此,本文的目的是确定多年来开发的一组软件测试过程模型,并研究它们对SG测试要求的适应性。为了达到目标,我们借助概念图将相关工作的SG需求分类。之后,在确定的需求的背景下讨论了来自文献的最流行的测试过程模型。从17个主要测试模型的列表中,六个测试模型(TPI Next,TMMi,Test SPICE,TIM,ISO / IEC / IEEE 29119和MTPF)被认为可能适用于SG域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号