Discovery and Remediation of Internal Erosion/Piping Voids between Incompatible Materials

机译:发现和修复不兼容材料之间的内部侵蚀/管道空隙

获取原文

摘要

During a May 2015 inspection, several depressions were observed surrounding the transmission line foundations on the Hennepin Island Earth Dam. Investigations of the depressions revealed the presence of fill materials with a wide range of particle sizes, some with minimal sand/fines content. Seepage was noted from a downstream retaining wall, approximately 10 feet lower in elevation and 20 feet horizontally from the depressions. The seepage was correlated to the depressions with tracer dye. The repair consisted of grouting the larger void spaces between the particles in the earth dam. This type of grouting is termed "compaction grouting", but the grouting operations were primarily intended to limit the potential for internal erosion through the coarse zone by filling void spaces. The grouting addressed an issue (i.e., erosion due to incompatible materials) and the Hennepin Island Earth Dam appears to be performing without additional internal erosion or a heightened phreatic surface.
机译:在2015年5月的一次检查中,在Hennepin Island Earth Dam的传输线基础周围观察到一些凹陷。对凹陷的研究表明,存在多种粒径的填充材料,其中一些具有最小的沙/细粉含量。从下游的挡土墙发现了渗漏,其高度约比凹坑低10英尺,而距凹陷处水平20英尺。渗漏与示踪染料与凹陷有关。修复工作包括在土坝中的颗粒之间注入较大的空隙空间。这种灌浆称为“压实灌浆”,但灌浆操作的主要目的是通过填充空隙来限制通过粗化区的内部侵蚀的可能性。灌浆解决了一个问题(即,由于不兼容的材料造成的侵蚀),Hennepin Island Earth Dam似乎没有额外的内部侵蚀或潜水面未变高。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号