首页> 外文会议>Association of State Dam Safety Officials annual conference >Loose Ended Levees? Levee Certification Process and Emergency Action Plan - A Case Study in Phoenix, Arizona
【24h】

Loose Ended Levees? Levee Certification Process and Emergency Action Plan - A Case Study in Phoenix, Arizona

机译:堤岸松散?堤坝认证流程和紧急行动计划-以亚利桑那州凤凰城为例

获取原文

摘要

This presentation will showcase a case study of a hanging levee in the City of Phoenix, Arizona. This hanging levee was built by the City and ties into the County's Skunk Creek 1 Levee (SK1), designed and built by the U.S. Army Corps' of Engineers. It will also discuss the accreditation process for each agency's Levees. Subsequent to the accreditation of the SK1 Levee, an Emergency Action Plan (EAP) was prepared by the Flood Control District of Maricopa County. This EAP, which covers both the SK1 Levee and the City's portion of the levee, will also be discussed briefly in this presentation. Complicating the City's PAL Agreement response to FEMA for the City's Levee, discussions regarding the SK1 Levee re-certification has begun between FEMA and the US Army Corps' of Engineers. Levees may pose a risk of failure by overtopping or breaching and cause flooding. Through the National Flood Insurance Program (NFIP), the Federal Emergency Management Agency (FEMA) requires that communities with levees must certify that per 44 CFR 65.10 The City submitted their levee certification package to FEMA, and is awaiting accreditation before a revised Flood Insurance Rate Map (FIRM) is printed. Rather than tie into high ground on the upstream end, the City levee ties into a levee operated by the Flood Control District of Maricopa County. The downstream levee end of the City levee is "loose ended" or "hanging" and does not tie into either the Skunk Creek channel banks or another levee. Emergency Action Plans (EAP) are now (as of 2016) required for all newly accredited Levees within any jurisdiction. An EAP was prepared for the Skunk Creek 1 Levee (SK1). The SK1 Emergency Action Plan (EAP) was prepared to coordinate monitoring of storm, river stage levels, and levee conditions with local emergency management and response activities in the event of an emergency. The EAP includes analysis of the hanging levee portion operated by the City.
机译:本演示文稿将展示亚利桑那州凤凰城市悬挂堤坝的案例研究。这座悬挂的堤坝是由城市建造的,并将县的Skunk Creek 1 Levee(SK1)建造,由U.S.陆军军团的工程师设计和建造。它还将讨论每个机构的levees的认证过程。在SK1 Levee的认可之后,由马里科帕县的防洪区制定了紧急行动计划(EAP)。这个EAP,涵盖SK1 Levee和城市的堤坝,也将在本演示文稿中简要讨论。对城市的堤坝对FEMA的讨论使城市的PAL协议反应复杂化,关于SK1 Levee重新认证在FEMA和美国陆军军团的工程师之间开始。堤坝可能通过过换或违反和造成洪水来构成失败的风险。通过国家洪水保险计划(NFIP),联邦应急管理机构(FEMA)要求使用levees的社区必须证明每44 CFR 65.10该市向FEMA提交了堤防认证包,并在修订后的洪水保险费之前等待认证地图(公司)是印刷的。城市堤坝在上游末端绑在高地,而不是绑在高地,该城市堤坝融入由马里科帕县洪水控制区运营的堤坝。城市堤坝的下游堤坝结束是“松散的结局”或“悬挂”,不符合臭鼬溪渠道银行或其他堤坝。紧急行动计划(EAP)现在(截至2016年)任何司法管辖区内的所有新认可的堤坝所需。为Skunk Creek 1 Levee(SK1)准备了EAP。 SK1紧急行动计划(EAP)准备在发生紧急情况下协调风暴,河流阶段和堤坝条件的监测,并在当地应急管理和响应活动。 EAP包括分析由城市运营的悬挂堤坝部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号