True Integrated Planning - Using Clean Water Act Investments to Transform a Cincinnati Community

机译:真正的综合规划-使用“清洁水法”投资改造辛辛那提社区

获取原文

摘要

Integrated Planning is an approach promoted by the USEPA for identifying projects that can address overlapping stormwater and wastewater regulations under the Clean Water Act (CWA) and will lead to efficient investment in infrastructure. When faced with a United States Environmental Protection Agency Consent Decree (Consent Decree), estimated to cost $3.1 Billion, the Metropolitan Sewer District of Greater Cincinnati (MSDGC) looked toward integrating planning for a way to do more than just address consent decree requirements and stormwater quality. MSDGC sought to develop a truly integrated plan that could also leverage the infrastructure investment towards revitalization of local communities that would be paying for the infrastructure. The initial plan proposed for partial implementation under the Consent Decree was a deep tunnel that buried investment dollars in an invisible, underground facility that only addressed CSO control through temporary storage of combined sewage. MSDGC investigated alternative opportunities for CSO control by reviewing watershed and community needs in the core area around the deep tunnel project and identified a combination of grey and green infrastructure projects that achieve stated requirements of the Consent Decree. The alternative projects were proposed to do this at a lower overall cost than the originally proposed tunnel solution and also incorporated MSDGC's goals of integrating stormwater quality and local community benefits. A major portion of the alternative project approach included a suite of projects within the Lick Run watershed. The foundation of the proposed Lick Run Wet Weather Strategy was one of implementing strategic sewer separation by integrating both grey and green infrastructure at the source of the runoff. The strategy includes managing separated stormwater through a combination of detention basins to manage stormwater quality and quantity with a hybrid grey and green conveyance system that incorporates green infrastructure practices in the core of the South Fairmont community. These features will provide a benefit to the community and serve as a catalyst for attracting redevelopment. The projects were planned and designed with the input and approval from the local South Fairmont community. MSDGC has completed 8 of the 12 major projects included in the Lick Run Wet Weather Strategy with the remaining four projects under construction. Upon completion, the suite of projects in the Lick Run watershed will reduce typical year CSO overflow volume by nearly 400 million gallons through the construction of grey and green infrastructure that includes benefits such as 9,900 feet of natural stream restoration; wetlands, bioswales, and stormwater basins planted with colorful native species in community-accessible spaces; and 5,600 feet of a daylighted stream through the corridor of a public space that has begun the redevelopment of a Cincinnati community. The projects in the Lick Run watershed are a demonstration of true integrated planning coming to reality: investing money required for addressing stormwater and wastewater requirements under the Clean Water Act in a manner that integrates benefits for local communities.
机译:综合规划是USEPA提倡的一种方法,用于识别可解决《清洁水法》(CWA)重叠的雨水和废水法规的项目,并将导致对基础设施的有效投资。面对美国环保署的《同意令》(Consent Decree),估计耗资31亿美元时,大辛辛那提大都市下水道地区(MSDGC)寻求整合规划,以做更多的工作,而不仅仅是解决同意令和雨水质量。 MSDGC寻求制定一个真正的整合计划,该计划还可以利用基础设施投资来振兴将为基础设施付费的当地社区。根据《同意令》提议部分实施的最初计划是一条深隧道,将投资资金埋在一个看不见的地下设施中,该设施只能通过临时存储合并的污水来解决公民社会组织的控制问题。 MSDGC通过审查深隧道项目周围核心区域的分水岭和社区需求,调查了CSO控制的替代机会,并确定了灰色和绿色基础设施项目的组合,这些项目均达到了《同意书》的既定要求。提出了替代项目,以比最初提出的隧道解决方案更低的总成本来实现此目的,并且还纳入了MSDGC的目标,即整合雨水质量和当地社区的利益。替代项目方法的主要部分包括在Lick Run分水岭内的一系列项目。拟议的“ Lick Run潮湿天气战略”的基础是通过在径流源处整合灰色和绿色基础设施来实施战略下水道分离的方法之一。该策略包括通过结合多个滞洪区来管理分离的雨水,以灰色和绿色混合运输系统管理雨水的质量和数量,该系统将绿色基础设施实践纳入了南费尔蒙特社区的核心。这些功能将为社区带来好处,并成为吸引重建的催化剂。这些项目是在南费尔蒙特当地社区的投入和认可下进行规划和设计的。 MSDGC已完成《 Lick Run潮湿天气战略》中包含的12个主要项目中的8个,其余四个项目正在建设中。完成后,Lick Run分水岭的这一系列项目将通过灰色和绿色基础设施的建设,减少9亿加仑的典型年度CSO溢流量,其中包括诸如9900英尺的自然溪流恢复之类的收益;在社区可及的空间内种植了湿地,生物沼泽和雨水盆地,种植了色彩斑native的本地物种;穿过公共空间走廊的5,600英尺日光流已经开始了辛辛那提社区的重建。 Lick Run分水岭上的项目展示了真正的综合计划得以实现:按照《清洁水法》的要求,以解决当地雨水和废水需求的方式进行投资,以整合当地社区的利益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号