A Dam Break Analysis Using HEC-RAS

机译:使用HEC-RAS的溃坝分析

获取原文

摘要

Dam break failures are often caused by overtopping of the dam due to inadequate capacity during large inflows into the reservoir from heavy precipitation run-off. The mathematical hydrodynamic simulation models can be used for prediction of dam breach flood hydrograph, and routing the same through downstream valley to get the time series of discharge and water level at different locations of the valley. The HEC-RAS model set up was prepared using the available data in the present paper. The critical condition for a dam break study is when the reservoir is at full reservoir level (FRL) and design flood hydrograph is impinged. Various breach parameters were considered for sensitivity analysis. The present study for project comprises of three hydrodynamic simulations using HEC-RAS mathematical model (a) PMF with dam break with initial reservoir level at FRL, (b) PMF discharge with no dam break, (c) PMF without dam in place (virgin condition). The maximum discharge, water level, velocity, and flood travel time at different locations of the river downstream of dam due to occurrence of PMF dam break are presented in the paper.
机译:溃坝失败通常是由于大雨量径流大量流入水库时,由于水位不足而导致水坝顶高而引起的。数学流体动力学模拟模型可用于预测大坝溃坝洪水水文,并将其路由通过下游河谷,以获得河谷不同位置的流量和水位的时间序列。使用本文中的可用数据准备了HEC-RAS模型的建立。溃坝研究的关键条件是水库处于满水位(FRL)且设计洪水水位受到影响时。考虑了各种违规参数以进行敏感性分析。本项目的当前研究包括使用HEC-RAS数学模型进行的三个水动力模拟(a)在FRL时具有初始水库水位的PMF有水坝折断,(b)在无水坝破坏的情况下PMF排放,(c)没有水坝就位的PMF健康)状况)。本文介绍了由于PMF大坝溃坝而在大坝下游河流不同位置产生的最大流量,水位,流速和洪水行进时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号