首页> 外文会议>Pipelines conference >Taming the Multi-Stakeholder Hydra: Permitting, Design, and Tunneling a Sewer across the Dulles International Airport and the Metrorail Silverline
【24h】

Taming the Multi-Stakeholder Hydra: Permitting, Design, and Tunneling a Sewer across the Dulles International Airport and the Metrorail Silverline

机译:驯服多方利益相关者九头蛇:允许在杜勒斯国际机场和Metrorail Silverline上铺设,设计和铺设下水道

获取原文

摘要

This case study will discuss the intricacies in planning, designing, permitting, and constructing a large-scale gravity sewer across the Dulles International Airport and with four tunneled crossings of the Washington Metropolitan Area Transportation Authority's Metrorail Silverline (Phase 2). The sewer was designed to serve Loudoun Water in Loudoun County, VA. Located just west of Washington, DC, in one of the fastest growing areas in the country, this new sewer is needed to meet Loudoun's projected wastewater demands in their Horsepen Run sewershed. This paper will outline the strategies implemented by the project team to facilitate and expedite stakeholders review and approval of the 20,000 linear-foot large diameter sewer (72/48/42 inch). In addition, the paper will outline how the scalable risk management strategy employed aided in maximizing value for Loudoun Water while minimizing risk.
机译:本案例研究将讨论在规划,设计,许可和建造横跨杜勒斯国际机场的大型重力下水道以及华盛顿大都会运输管理局的Metrorail Silverline的四个隧道交叉口(第二阶段)的复杂性。下水道的设计目的是为弗吉尼亚州劳登县的劳登水提供服务。该新下水道位于华盛顿特区以西,是该国发展最快的地区之一,需要满足Loudoun在Horsepen Run下水道中预计的废水需求。本文将概述项目团队实施的策略,以便利和加快利益相关者对20,000英尺线性直径大直径下水道(72/48/42英寸)的审核和批准。此外,本文还将概述所采用的可扩展风险管理策略如何在最大程度地降低风险的同时,帮助最大化劳登水的价值。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号