Challenging 72-Inch Dual Pipe Relocations through Nob Hill for San Diego County Water Authority

机译:通过Nob Hill向圣地亚哥县水务局挑战72英寸的双管道搬迁

获取原文

摘要

The Second San Diego Aqueduct is located within the San Diego County Water Authority's (SDCWA) right of way that traverses the Scripps Ranch community, south of Miramar Hill. After crossing Interstate 15, the Second Aqueduct, which contains Pipelines 3, 4, and 4A, travels through a residential area, crosses Scripps Ranch Boulevard, and ascends a hill known as "Nob Hill." Certain operating conditions within the Water Authority's Second Aqueduct were predicted to produce transient events that could result in water column separation in the vicinity of the high point at Nob Hill. The transient event had the potential of damaging or rupturing Pipelines 3 and 4 and producing a catastrophic event for the Aqueduct system and the residential areas down-slope of the pipelines as they cross Nob Hill. This section of the Second Aqueduct contains the Water Authority's Pipelines 3 and 4. Both are 72-inch diameter prestressed concrete cylinder pipe (PCCP), with Pipeline 4 having the addition of steel liners. To prevent a potential catastrophic event, SDCWA completed a project to "lower" both existing pipelines, thereby increasing the hydraulic gradient in the pipelines and reducing the potential for a damaging transient pressure event. This paper will discuss the difficulties in combining two, 72-inch diameter PCCP pipelines, along different elevations and slopes, into one 96-inch diameter steel pipeline, tunneled through Nob Hill. Several design and installation issues will be examined.
机译:圣地亚哥第二渡槽位于圣地亚哥县水务局(SDCWA)的右侧,该路线横穿美丽华山以南的斯克里普斯牧场社区。穿过15号州际公路后,包含3号,4号和4A号管道的第二渡槽穿过一个居民区,穿越斯克里普斯牧场大道,然后爬上一个被称为“诺布山”的小山。预计水务局第二渡槽内的某些运行条件会产生瞬态事件,这些瞬态事件可能导致在Nob Hill的高点附近发生水柱分离。瞬态事件可能会损坏或破坏3号和4号管线,并给输水管道系统和穿过Nob Hill的管线下坡居民区造成灾难性事件。第二渡槽的此部分包含水务局的管道3和4。它们都是直径为72英寸的预应力混凝土圆柱管(PCCP),管道4带有钢衬。为了防止潜在的灾难性事件,SDCWA完成了一个“降低”两条现有管道的项目,从而增加了管道中的液压梯度,并减少了造成破坏性瞬态压力事件的可能性。本文将讨论将两条72英寸直径的PCCP管道(沿着不同的海拔和坡度)合并到一条穿过Nob Hill的96英寸直径的钢管道中的困难。将研究几个设计和安装问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号