Robustness Analysis of Design Phase Performance Predictors Using Extreme Bounds Analysis (EBA)

机译:使用极限范围分析(EBA)的设计阶段性能预测器的稳健性分析

获取原文
获取外文期刊封面目录资料

摘要

The design phase is one of the important phases in any construction project. Leading cost and schedule performance indicators of design phase have been studied by some of the researchers, however, these variables' robustness has been studied rarely. The goal of this research is to discern between the robust and fragile cost overrun and schedule delay indicators of the design phase. Both extreme bounds analysis (EBA) methods including Learner's and Sala-i-Martin were implemented in this research. The Learner's method only considers the extreme bounds of the indicator's distribution while Sala-i-Martin focuses on the whole indicator's distribution. Results of this study revealed robust cost overrun and schedule delay indicators in the design phase. Project managers can use the findings of this research to prioritize the more robust indicators as higher priority and reduce required design modifications within the project process.
机译:设计阶段是任何建设项目中的重要阶段之一。一些研究人员已经研究了设计阶段的领先成本和进度性能指标,但是,很少研究这些变量的鲁棒性。这项研究的目的是区分设计阶段的健壮和脆弱的成本超支与进度延迟指标。这项研究采用了包括学习者和Sala-i-Martin在内的两种极端边界分析(EBA)方法。学习者的方法仅考虑指标分布的极限,而Sala-i-Martin则关注整个指标的分布。这项研究的结果表明,在设计阶段,有可靠的成本超支和进度延迟指标。项目经理可以使用这项研究的结果,将更可靠的指标作为优先级进行优先排序,并减少项目流程中所需的设计修改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号