首页> 外文会议>ASME Pressure Vessels Piping Conference >LOW-CYCLE FATIGUE OF BASE-PLATE-TO-SHELL CONNECTION IN UPLIFTING LIQUID STORAGE TANKS UNDER SEISMIC LOADING
【24h】

LOW-CYCLE FATIGUE OF BASE-PLATE-TO-SHELL CONNECTION IN UPLIFTING LIQUID STORAGE TANKS UNDER SEISMIC LOADING

机译:地震荷载作用下储液罐基础板壳连接的低周疲劳

获取原文

摘要

Unanchored steel tanks, subjected to strong seismic loading, may exhibit base plate uplifting. Under repeated uplifting, the welded connection of the tank base plate with the tank shell (a fillet-welded connection) is subjected to strong cyclic deformation, involving reverse plastic loading, and this could lead to failure of the welded connection in the form of low-cycle fatigue cracking. In the present paper, an experimental program is described, supported by numerical finite-element simulations. The tests are aimed at investigating the mechanical response of small-scale welded specimens, representing the connection of the base plate with the tank shell, subjected to uplifting loading conditions. The research has been partially supported by European research project INDUSE-2-SAFETY, on the seismic safety and resilience of critical components in industrial plants.
机译:未锚固的钢制罐承受强烈的地震载荷,可能会出现底板抬升的情况。在反复抬升的情况下,罐底板与罐壳的焊接连接(角焊连接)会经历强烈的周期性变形,包括反向塑性载荷,这可能导致焊接连接失效,形式为低载荷。循环疲劳开裂。在本文中,描述了一个实验程序,并辅以数值有限元模拟。这些测试旨在调查小规模焊接试样的机械响应,这些试样代表底板与罐壳之间在提升载荷条件下的连接。该研究得到了欧洲研究项目INDUSE-2-SAFETY的部分支持,该项目涉及工业工厂中关键部件的地震安全性和弹性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号