首页> 外文会议>International Conference on Information Science and Communications Technologies >A Study on Life Cycle Cost on Railway Switches and Crossings
【24h】

A Study on Life Cycle Cost on Railway Switches and Crossings

机译:铁路道岔和道口的生命周期成本研究

获取原文

摘要

Switches and crossings (S&Cs) are one of the vital subsystems in railway. The main function of an S&C is to help trains to safely move from one track to another track. To do this, an S&C consists of movable and fixed mechanical parts, as well as signaling and electrical systems. Each of these systems requires a proper maintenance and is susceptible to failures which ultimately lead to train disturbances. The aim of the paper is to carry out life cycle cost analysis for railway S&C which operate over more 40 years. We decompose the life cycle of the S&C and break down them into subsystems to identify which of them requires maintenance. We demonstrated how to decide optimal S&C through cost identification and system breakdown.
机译:道岔和道口(S&C)是铁路中至关重要的子系统之一。 S&C的主要功能是帮助火车安全地从一条轨道移动到另一条轨道。为此,S&C由可移动和固定的机械零件以及信号和电气系统组成。这些系统中的每一个都需要适当的维护,并且容易发生故障,最终会导致列车干扰。本文的目的是对运营40多年的铁路S&C进行生命周期成本分析。我们分解了S&C的生命周期,并将其分解为子系统,以确定哪些子系统需要维护。我们演示了如何通过成本识别和系统细分来确定最佳的S&C。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号