首页> 外文会议>SPIE Astronomical Telescopes + Instrumentation Conference >Connecting ELT to the current VLT operations scheme: how the Telescope and Instrument Operators, as well as other groups at Paranal Observatory, are preparing the staff for the ELT era
【24h】

Connecting ELT to the current VLT operations scheme: how the Telescope and Instrument Operators, as well as other groups at Paranal Observatory, are preparing the staff for the ELT era

机译:将ELT连接到当前的VLT操作方案:望远镜和仪器操作员以及Paranal天文台的其他小组如何为ELT时代的人员做好准备

获取原文

摘要

Several challenges will have to be faced by the staff at Paranal Observatory in order to be well prepared for a seamless integration of the ELT in the current VLT operations scheme. The Telescopes and Instruments Operator group (TIO) is already undergoing changes connected with some of the identified technological and operational needs for the ELT. This paper will have detailed information about the current training needs, group structural changes, the current activities using the adopted engineering-TIO [2] (eTIO) scheme and the staffing plan that will have to be applied in order to keep the centralized support of the biggest world infrastructure in astronomy at the time of the ELT, to handle daily science operations for seven different telescopes, the VLT interferometer and twenty-one scientific instruments in parallel.
机译:为了为将ELT无缝集成到当前的VLT作战计划中做好充分的准备,Paral天文台的工作人员将面临一些挑战。望远镜和仪器操作员组(TIO)已经进行了与ELT某些已确定的技术和操作需求相关的更改。本文将详细介绍当前的培训需求,团队结构的变化,采用已采用的Engineering-TIO [2](eTIO)计划的当前活动以及必须采用的人员配置计划,以保持对培训的集中支持。 ELT当时是世界上最大的天文学基础设施,可同时处理7种不同望远镜,VLT干涉仪和21台科学仪器的日常科学操作。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号