首页> 外文会议>ASME Pressure Vessels and Piping conference >STUD BOLT THREAD ENGAGEMENT-IMPLICATIONS OF APPLYING NEW CONSTRUCTION REQUIREMENTS IN POST CONSTRUCTION SCENARIOS
【24h】

STUD BOLT THREAD ENGAGEMENT-IMPLICATIONS OF APPLYING NEW CONSTRUCTION REQUIREMENTS IN POST CONSTRUCTION SCENARIOS

机译:螺栓螺栓螺纹接合-在后期施工场景中应用新施工要求的含义

获取原文

摘要

In its 2016 Edition, ASME B31.3 removed its long held provision for thread engagement that deemed the lack of complete engagement acceptable if the lack of engagement is not more than one thread. This change can have implications on existing piping assemblies which prompted some clarifications in ASME PCC-1. This paper reviews some of the reasons for the change, the issues around determining a specific measurable criterion of an acceptable amount of thread engagement, and proposes alternate criteria for the new construction codes to consider that are easily measurable and enforceable.
机译:在其2016版中,ASME B31.3删除了其长期保留的关于线程参与的条款,该条款认为如果缺乏参与不超过一个线程,则缺乏完全参与是可以接受的。此更改可能会对现有管道组件产生影响,这促使在ASME PCC-1中进行了一些澄清。本文回顾了一些变化的原因,围绕确定可接受的螺纹接合量的特定可测量标准的问题,并提出了新的构造规范的替代标准,以考虑这些标准易于测量和执行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号