首页> 外文会议>Transmission and substation design and operation symposium >A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design
【24h】

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design

机译:更快的传输系统保护方案和接地网设计的成本效益分析

获取原文

摘要

This paper analyzes how reducing tripping times affects the capital cost of a transmission station's ground grid. A range of trip times are examined to demonstrate the increased cost of a slower tripping scheme and its relationship with substation ground grid design. This relationship is used to determine the potential savings when utilizing faster protection schemes on modern relays.
机译:本文分析了减少跳闸时间如何影响传输站地面电网的投资成本。检查了一定的跳闸时间,以证明较慢的跳闸方案的成本增加及其与变电站地面电网设计的关系。当在现代继电器上利用更快的保护方案时,此关系用于确定潜在的节省。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号