The Mt. Ida project is located in Canakkale Province, Turkey, near the Village of Tuzla. Yerka Elektrik UEretim A.S. ("Yerka") began geothermal resource exploration activities in 2013 with the drilling of two intermediate-depth wells, followed by geological and geophysical surveying in 2014-2015. Since 2014, GeothermEx has supported Yerka with resource evaluation and guidance on development and drilling-risk reduction for the Mt. Ida project. Since 2016, Yerka has successfully drilled six deep wells. Well testing indicates that the project has sufficient production and injection capacity for a geothermal plant with an estimated capacity of 12 MW gross and a planned commercial operation date in the summer of 2019. This paper describes drilling and testing results that have allowed detailed characterization of the Mt. Ida geothermal resource. The reservoir is primarily in fractured marble formations. The production wells yield brine with a mass-weighted average temperature of 127°C and a salinity of approximately 50,000 parts per million. Non-condensable gas concentrations are in the range of 0.5% to 0.6% by weight in total flow. The wells have shown significant benefits from acid stimulations through coiled tubing, with Productivity Indices post-acid ranging from 21 to 139 tons/hour per bar. Pressure interference testing shows that the entire wellfield is interconnected, which is beneficial from the perspective of maintaining pressure support by injection. However, the interference is low enough that thermal breakthrough by injection should not be a concern. The use of electric submersible pumps is planned to boost production rates and provide a greater measure of operational control.
机译:山。 Ida项目位于土耳其恰纳卡莱省,靠近图兹拉村。 Yerka Elektrik UEretim A.S. (“ Yerka”)于2013年开始进行地热资源勘探活动,钻了两个中深度井,然后在2014-2015年进行了地质和地球物理勘测。自2014年以来,GeothermEx一直在为Yerka提供资源评估和有关Mt矿山开发和降低钻井风险的指导。 Ida项目。自2016年以来,Yerka已成功钻探了6口深井。试井表明,该项目对地热发电厂具有足够的生产和注入能力,预计总装机容量为12兆瓦,计划于2019年夏季投入商业运营。公吨。艾达地热资源。该储层主要是破裂的大理石地层。生产井产生的盐水的质量加权平均温度为127°C,盐度约为50,000 ppm。不可冷凝气体的浓度为总流量的0.5%至0.6%(重量)。这些井已显示出通过连续油管增产酸的巨大好处,产酸后的生产率指数范围为每条每小时21至139吨/小时。压力干扰测试表明整个井场是相互连接的,这从通过注入维持压力支持的角度来看是有益的。但是,干扰非常低,以至于注射时的热穿透都不是问题。计划使用潜水电泵来提高生产率,并提供更大程度的操作控制措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号