首页> 外文会议>Air and Waste Management Association annual conference and exhibition >Pilot Testing, Design, Installation, and Operation of an Active Sub-Slab Vapor Mitigation System to Address PCE Issues at a Former Dry Cleaning Facility in Denver, Colorado
【24h】

Pilot Testing, Design, Installation, and Operation of an Active Sub-Slab Vapor Mitigation System to Address PCE Issues at a Former Dry Cleaning Facility in Denver, Colorado

机译:为解决科罗拉多州丹佛市一家以前的干洗设施中的PCE问题而设计的主动式平板式蒸汽减排系统的试点测试,设计,安装和操作

获取原文

摘要

Based on the above, the following conclusions are made: 1.In lieu of using general guidelines for sizing and selecting equipment for active VMSs, it is preferable that VMS designers conduct a pilot test to obtain data which more accurately address site-specific conditions. In this way, many of the variables such as sub-slab soil permeability to vapor flow, slab type, sub-slab foundation structures, and vapor flow pathways can be more accurately accounted for. Additionally, pilot test data provide valuable information that can be used to determine the equipment needed for a specific area of concern which can provide the most technically effective and cost effective VMS design.
机译:基于上述结论,得出以下结论:1.代替使用通用准则来确定和选择有源VMS的设备,VMS设计人员最好进行中试测试,以获得更准确地针对特定地点条件的数据。通过这种方式,可以更准确地考虑许多变量,例如,亚平板土壤对蒸汽流动的渗透性,平板类型,亚平板基础结构和蒸汽流动路径。此外,中试数据还提供了有价值的信息,这些信息可用于确定特定关注区域所需的设备,从而可以提供技术上最有效和成本效益最高的VMS设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号