首页> 外文会议>Pipelines conference >Fixing the OM Budget with Asset Management to Create More Capital Debt Capacity for Pipe Projects
【24h】

Fixing the OM Budget with Asset Management to Create More Capital Debt Capacity for Pipe Projects

机译:通过资产管理确定运维预算,为管道项目创造更多的资本债务能力

获取原文

摘要

Infrastructure asset management programs should be focused on managing assets in a way in which the investment for each asset can be optimized producing overall cost savings in both operations and capital budgets. While there is a great amount of evidence of increasing water main breaks and further aging water infrastructure failures an approach looking at each stage of the asset's life cycle is important in reducing costs, allocating resources effectively, and providing a financial condition where the debt ratio can have a margin necessary to issue debt to support water pipe repair and replacement projects. In order to best take into consideration all of the aspects of determining the likelihood of failure as part of the maintenance and capital repair and replacement programs, machine learning can be used as a desktop condition assessment exercise to increase accuracy in predicting the segments of pipe needing additional investment.
机译:基础设施资产管理计划应专注于资产管理,以便可以优化每种资产的投资,从而在运营和资本预算中节省总体成本。尽管有大量证据表明供水主管道中断次数增加以及供水基础设施进一步老化,但查看资产生命周期各个阶段的方法对于降低成本,有效分配资源并提供债务比率可以承受的财务状况很重要。有必要的保证金来发行债务以支持水管维修和更换项目。为了最好地考虑确定故障可能性的所有方面,将其作为维护和资本维修与更换计划的一部分,可以将机器学习用作桌面状态评估活动,以提高预测所需管道段的准确性追加投资。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号