Hurricanes, Conquistadors, and Endangered Species-The Unique Challenges of Under- Bridge Pipe Replacement on Florida's Historic Coast

机译:飓风,征服者和濒危物种-佛罗里达州历史悠久的海岸的桥下管道更换的独特挑战

获取原文

摘要

Years of salt exposure from the Atlantic Ocean has taken its toll on two aged water and sewer pipes mounted under the Matanzas Inlet Bridge in St. Johns County, Florida. The inlet, named after the 1565 massacre of 245 French Huguenots by Spanish Conquistadors, is home to a National Monument, four different endangered species, and was hit by hurricanes during both the design and construction of this project. Replacing these pipes over the Matanzas Inlet combined unique technical, environmental, permitting, and construction challenges. The Matanzas Inlet is known for its swift currents and shifting sand bars. This limited construction options for replacing the pipes. The location of the water and sewer pipes was very difficult to access under the bridge-given safety and constructability concerns, the design team developed three different construction approach options for contractors to consider. Additionally, with these pipes being on the coast of Florida, the support structure had to be designed to withstand hurricane force winds and significant thermal variation. The beautiful coastal habitat of the National Monument is home to protected nesting sea turtles, gopher tortoises, the Anastasia Beach Mouse, and the Least Tern (a small ground nesting bird). With multiple endangered species present, the team coordinated closely with the National Park Service throughout the design and construction of the project. Additionally, the team included an environmental consultant that provided monitoring, protection, and educational presentations for the construction workers during the project. These environmental constraints created strict seasonal and daily construction constraints for the contractor. Besides the known environmental challenges of this project, Mother Nature provided two additional surprises. As the project was nearing bidding, the inlet was hit by Hurricane Matthew which impacted the base design information and further deteriorated the condition of the pipes-accelerating the need for the project. Then, during construction the site was hit by Hurricane Irma which required demobilization and stabilization of the site before the hurricane's impact. This presentation explores the unique aspects of this project, the technical solutions the team developed, and the close collaboration with various stakeholders.
机译:多年来,来自大西洋的盐暴露给安装在佛罗里达州圣约翰斯县马坦萨斯进水桥下的两条老化的水管和下水道造成了损失。该入口以西班牙征服者在1565年对245个法国雨果人大屠杀的名字命名,是国家纪念碑(四个不同濒危物种)的所在地,在该项目的设计和施工过程中都遭受了飓风的袭击。在Matanzas Inlet上更换这些管道带来了独特的技术,环境,许可和施工挑战。马坦萨斯湾(Matanzas Inlet)以迅捷的水流和不断变化的沙洲而闻名。这限制了更换管道的施工选择。考虑到桥梁的安全性和可施工性,水管和下水道的位置很难进入,设计团队开发了三种不同的施工方法供承包商考虑。此外,由于这些管道位于佛罗里达海岸,因此必须设计支撑结构以承受飓风和重大的热变化。国家纪念碑(National Monument)美丽的沿海栖息地是受保护的筑巢海龟,地鼠陆龟,Anastasia Beach Mouse和Least Tern(地面筑巢的小鸟)的栖息地。在存在多种濒危物种的情况下,该团队在项目的整个设计和施工过程中与国家公园管理局紧密合作。此外,该团队还包括一名环境顾问,该顾问在项目期间为建筑工人提供了监视,保护和教育方面的介绍。这些环境限制对承包商造成了严格的季节性和日常施工限制。除了该项目已知的环境挑战之外,大自然母亲还带来了另外两个惊喜。由于该项目接近招标,马修飓风袭击了该进水口,这影响了基础设计信息,并进一步恶化了管道状况,从而加速了对该项目的需求。然后,在施工过程中,现场受到伊尔玛飓风的袭击,该飓风要求在飓风袭来之前复员并稳定现场。本演讲探讨了该项目的独特方面,团队开发的技术解决方案以及与各个利益相关者的紧密合作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号