首页> 外文会议>International foundations congress and equipment expo >Compaction Grouting Beneath Brownstone Buildings Founded on Soft Ground
【24h】

Compaction Grouting Beneath Brownstone Buildings Founded on Soft Ground

机译:在软土地上建立的褐石建筑下的压实灌浆

获取原文

摘要

This paper presents the design and installation of compaction grout columns beneath four brownstone buildings through fill and organics and founded on silty sands. Grouting was carried out in three bottom up stages in two rows of inclined holes. A column diameter of 3 ft was generally achieved in the organics. Diameters in the fill were more variable ranging from 1.2 to 3.6 ft. The buildings were monitored during grout injection. During grouting of the first five holes, detectable displacements up to 0.1 ins were observed in the facade walls and up to 2 ins in a floor slab in the basement. No significant upward displacements were observed during sequential grouting in holes at twice the spacing. However, grouting adjacent holes immediately after completing a previous hole resulted in significant displacements. A 14-h waiting period between grouting operations was necessary to allow dissipation of generated pore pressures and relaxation of the soils to take place. An observational approach was adopted where injection volumes were progressively reduced when either 0.1 ins of accumulated displacement or 0.024 ins per stage has been reached.
机译:本文介绍了通过填充和有机物在粉砂下建造的四个褐砂石建筑下方的压实灌浆柱的设计和安装。在三个自下而上的阶段中,在两排倾斜孔中进行灌浆。有机物的色谱柱直径通常达到3 ft。填充物的直径变化范围在1.2到3.6英尺之间。在灌浆过程中对建筑物进行了监控。在对前五个孔进行注浆的过程中,在外墙中观察到的位移高达0.1 ins,在地下室的楼板中观察到的位移高达2 ins。在以两倍间距进行的孔中连续注浆过程中,未观察到明显的向上位移。但是,在完成前一个孔之后立即对相邻孔进行灌浆会导致明显的位移。注浆操作之间需要等待14小时,以消散产生的孔隙压力并放松土壤。当观察到的累积排量达到0.1 ins或每级0.024 ins时,注射量逐渐减少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号