首页> 外文会议>Offshore technology conference >A Cost Reduction Methodology for Offshore Projects
【24h】

A Cost Reduction Methodology for Offshore Projects

机译:海上项目的成本降低方法

获取原文
获取外文期刊封面目录资料

摘要

Current oil prices have made the offshore exploration of oil reserves a major challenge for oil companies. Standardization and extensive use of chattered units has allowed Petrobras to effectively promote competitiveness, cost reduction and reduced schedules in its projects. As a step forward in its pursue for cost reduction Petrobras has recently looked into Integrated Field Development. This article presents a low cost methodology for the design of production systems. Experience shows that integration among reservoir, flow assurance, subsea, well design and topsides teams is crucial for achieving a successful project. Besides being pursued for a long time, this integration has only been partially achieved in the industry and cost reduction opportunities have been lost. This article shows a cost driven methodology that can be used for guidance in the generation and screening of FEL1 alternatives. Metrics for the various parts of the system have been created and integrated in a simulation environment that allows economic analysis of different sorts. In FEL2 the methodology allows, for example, the evaluation of the number and capacity of platforms, the optimal schedule of well construction, the use of flexible or rigid risers, the diameter of production lines and the choice of technologies for handling streams w ith high C02 concentration in an integrated way. A simulation of an oil field shows effective results. In this new methodology a representation of each discipline is developed to allow their integration with the objective of making comparative economic analysis of alternatives.
机译:当前的石油价格使海上石油储量勘探成为石油公司的主要挑战。 Petrobras的标准化和广泛使用,使Petrobras在其项目中有效地提高了竞争力,降低了成本并缩短了工期。作为降低成本的新举措,巴西国家石油公司(Petrobras)最近研究了综合田间开发。本文提出了一种用于生产系统设计的低成本方法。经验表明,储层,流量保证,海底,油井设计和顶侧团队之间的集成对于成功完成项目至关重要。除了长期以来的追求外,这种集成在行业中仅得到部分实现,并且降低了成本降低的机会。本文显示了一种成本驱动的方法,可用于指导FEL1替代品的产生和筛选。已经创建了系统各个部分的度量标准并将其集成到允许对各种类型进行经济分析的模拟环境中。在FEL2中,该方法可以评估平台的数量和容量,优化井的建设进度,使用柔性或刚性立管,生产线的直径以及选择用于处理高流量的技术的方法。二氧化碳浓度的综合计算。油田模拟显示了有效的结果。在这种新的方法论中,每个学科的表述都得以发展,以使其与旨在对替代方案进行比较经济分析的目标融为一体。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号