首页> 外文会议>Offshore technology conference >Sustainable Offshore Wind Energy: Faster and Larger at Lower Cost and Less Environmental Impact
【24h】

Sustainable Offshore Wind Energy: Faster and Larger at Lower Cost and Less Environmental Impact

机译:可持续的海上风能:更快,更大,成本更低,对环境影响更小

获取原文

摘要

Objective: "The offshore wind industry is in the process of becoming an advanced and mature industry in North Western Europe, with the costs of the energy produced by offshore wind farms rapidly decreasing. The cost of offshore wind energy, however, is still higher than the cost of energy from fossil sources. The success of offshore wind, as a significant contributor to the global energy supply in the future, will depend on future energy prices, enabling legislation to further develop offshore wind and technologies that reduce CAPEX and OPEX costs. This paper will present an overview of technologies that are being developed by Van Oord and other innovative companies in the offshore wind supply chain, notably AdBm from the USA and Fistuca from the Netherlands. The presented technology developments aim at lowering the costs of foundations for offshore wind turbines, which is a significant part of the total CAPEX cost. The costs of foundations can be reduced by: 1) optimizing the design; this means less weight, easier to install and with the lowest possible maintenance costs over its lifetime, 2) developing installation vessels and equipment that enable faster installation with limited dependency on sea state. At the same time, wind turbine manufacturers are developing larger offshore wind turbines and legislators are instituting more limitations, for example on the emissions of underwater noise. These developments create additional challenges for upscaling the installation capacity and performance of vessels and pile driving equipment and the development of technology that reduces or abates underwater noise. This paper presents an overview of new technologies related to foundation design, installation vessels, pile driving technology and noise mitigation systems and the challenges to get those new technologies ready for implementation as fast as possible. These new technologies will become relevant for upcoming sector developments, e.g. in North America and Asia, with specific local challenges like difficult soil conditions, restricted installation periods due to weather constraints, or noise mitigation to prevent damage of sensitive marine life.
机译:目标:“海上风能产业正在成为北欧的先进和成熟产业,海上风电场产生的能源成本迅速下降。但是,海上风能的成本仍然高于作为未来全球能源供应的重要贡献,海上风能的成功取决于未来的能源价格,使立法能够进一步开发海上风能和降低CAPEX和OPEX成本的技术。本文将概述Van Oord和其他创新公司在海上风电供应链中开发的技术,特别是美国的AdBm和荷兰的Fistuca,这些技术的发展旨在降低海上风电基础的成本。风力涡轮机是总CAPEX成本的重要组成部分,可以通过以下方式降低基础成本:1)优化设计;这意味着重量更轻,安装更容易并且在其生命周期内的维护成本降至最低; 2)开发安装容器和设备,从而能够在对海洋状况的有限依赖下实现更快的安装。同时,风力涡轮机制造商正在开发更大的海上风力涡轮机,而立法者正在施加更多的限制,例如对水下噪声的排放。这些发展为提高船舶和打桩设备的安装能力和性能以及降低或减轻水下噪声的技术发展提出了额外的挑战。本文概述了与基础设计,安装容器,打桩技术和噪声消除系统有关的新技术,以及为尽快实施这些新技术而面临的挑战。这些新技术将与即将到来的行业发展相关,例如在北美和亚洲,当地面临特定挑战,例如艰难的土壤条件,由于天气原因而限制了安装时间,或者是为了防止敏感海洋生物受到损害而采取的减噪措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号