The construction industry has used best-value (BV) in traditional design-bid-build (D-B-B) projects, and this raises questions regarding the influence of qualifications-based evaluation criteria on the outcomes of BV awarded contractors. The main objective of this study was to examine the consequences of contractor selections using BV for D-B-B projects. This study focused on the characteristics of selected contractors and identification of which evaluation criteria (cost, schedule, and several qualifications-based criteria) that have the greatest differentiation among competing bidders. The data sample consists of 171 D-B-B projects procured using BV; the majority of projects are vertical construction projects located in the institutional sector. The owner's evaluation matrix was compiled for each project, including the owner evaluation committee's scoring for each competing contractor. Descriptive statistics were used to identify the characteristics of selected contractors in terms of their ranking relative to competing bidders on both cost and qualifications-based evaluation criteria. Results show that in BV procurement, the lowest bidders were selected 42% of the time with 14.8% in the average cost differential versus low-bid options. Certain qualifications-based criteria, such as technical proposal, interview, past performance, and safety, were found to have a greater variance than cost submission among competing contractors. The finding from this study refutes the perception that there is minimal variation in contractor qualifications. It also contributes to the body of knowledge by providing an empirical data set across numerous BV D-B-B projects and considering all competing bids for each project.
机译:建筑行业在传统的设计—投标—建造(D-B-B)项目中使用了最佳价值(BV),这引起了有关基于资格的评估标准对BV授予承包商的结果的影响的疑问。这项研究的主要目的是检查使用BV进行D-B-B项目的承包商选择的后果。这项研究的重点是选定承包商的特征,并确定在竞标者之间差异最大的评估标准(成本,进度和基于资格的几种标准)。数据样本包括使用BV采购的171个D-B-B项目;大多数项目是位于机构部门的垂直建设项目。为每个项目编制了业主评估矩阵,包括业主评估委员会对每个竞争承包商的评分。描述性统计数据用于根据成本和基于资格的评估标准,根据所选承包商相对于竞标者的排名来确定其特征。结果表明,在BV采购中,最低出价者在42%的时间内被选中,平均成本差异与低价选择相比为14.8%。发现某些基于资格的标准,例如技术建议,访谈,过去的表现和安全性,与竞争承包商之间的成本提交相比,差异更大。这项研究的发现驳斥了承包商资历变化最小的看法。它还通过提供跨多个BV D-B-B项目的经验数据集并考虑每个项目的所有竞争性投标来为知识体系做出贡献。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号