首页> 外文会议>Construction research congress >Model Maturity Risk Index Framework for Tracking Progress in Model-Based Engineering
【24h】

Model Maturity Risk Index Framework for Tracking Progress in Model-Based Engineering

机译:用于跟踪基于模型的工程进度的模型成熟度风险指数框架

获取原文

摘要

Today, more than 85% of firms engaged in high levels of model-based engineering and construction have a positive perception of the value they receive for the time, money, and efforts they have expended on their modeling programs. Nevertheless, there are no established processes and metrics for measuring the progress of a model-driven engineering process, as particularly the deliverable type, schedule reporting, and their impacts have changed. A key underlying challenge is how progress and level of effort in a model-driven engineering process can be measured and reported. Definitions such as level of development (LOD) have been established in the commercial building sector for tracking completeness in modeling work, yet there are no established processes and metrics that can reliably measure the progress of a model-driven engineering process as a function of the maturity of the model and the data that supports the engineering process. To address this gap in knowledge, this paper presents a new framework based on a new set of model maturity index (MMI) definitions that measures maturity and progress in engineering work; based on factors that provide insight, manage, control opportunities, and accounts for the unavailability of vendor data, design changes, re-work and design development, model review comments, operability reviews, hazard and operability studies, among other factors. The MMI definitions were validated via charrettes with engineering and project controls experts from the process industrial sector.
机译:如今,从事高水平基于模型的工程和构造的公司中,超过85%的公司对他们在建模程序上花费的时间,金钱和努力所获得的价值有着积极的看法。但是,由于没有确定的过程和度量标准来衡量模型驱动的工程过程的进度,尤其是可交付成果的类型,进度报告及其影响已发生变化。潜在的关键挑战是如何测量和报告模型驱动的工程过程中的进度和工作量。在商业建筑领域中已经建立了诸如开发水平(LOD)之类的定义,以跟踪建模工作的完整性,但是尚无已建立的过程和度量能够可靠地衡量模型驱动工程过程的进度(取决于模型的功能)。模型和支持工程过程的数据的成熟度。为了解决这一知识差距,本文提出了一个基于新的模型成熟度指数(MMI)定义集的新框架,该定义可以衡量工程工作的成熟度和进度。基于提供洞察力,管理,控制机会并说明供应商数据不可用,设计变更,返工和设计开发,模型审查意见,可操作性审查,危害和可操作性研究等因素。通过与过程工业领域的工程和项目控制专家一起通过图表验证了MMI定义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号