Explanation of change study update to examine the cost, schedule, and technical changes to NASA projects

机译:解释变更研究更新,以检查NASA项目的成本,进度和技术变更

获取原文

摘要

The original National Aeronautics and Space Administration (NASA) Explanation of Change (EoC) study was conducted in 2010 to understand the underlying causes of cost and schedule growth. The first study consisted of 25 missions launched from 2000 to 2010 and looked at the events that led to growth. These events were categorized into different “bins” that were rolled up to quantify whether the growth was due to internal planning, or internal execution, or from external forces and found that the growth was evenly distributed among those three categories. The result of the study presented nine considerations focused at reducing growth due to project external events and internal planning events. Although no one “magic bullet” consideration was discovered in the previous work, the nine considerations taken as a whole were postulated to help reduce cost and schedule change in future NASA missions. A recent update was conducted that included investigating 8 missions developed since the previous study to determine if the results were different. Cost, schedule, and mass increases were analyzed from the start of Phase B through Preliminary Design Review and Critical Design Review to Launch. As shown in this paper, the results are better with overall cost and schedule growth being reduced. The paper will show a comparison of the previous results to the updated results to show specific reductions and provide an explanation of which recommendations were followed.
机译:美国国家航空航天局(NASA)最初于2010年进行了变革解释(EoC)研究,以了解成本和时间表增长的根本原因。第一项研究包括从2000年到2010年发起的25个任务,研究了导致增长的事件。这些事件被分类到不同的“箱”中,以量化增长是内部计划,内部执行还是外部力量造成的,发现增长在这三个类别之间平均分配。研究的结果提出了九个考虑因素,这些考虑因素集中在减少由于项目外部事件和内部计划事件引起的增长。尽管在先前的工作中没有人发现“魔术子弹”的考虑因素,但假设将这9个考虑因素作为一个整体考虑,以帮助降低成本,并在未来的NASA任务中更改时间表。最近进行的更新包括调查自上次研究以来开展的8个任务,以确定结果是否不同。从B阶段开始到初步设计评审和关键设计评审开始,对成本,进度和质量增加进行了分析。如本文所示,在降低总体成本和减少进度增长的同时,效果更好。本文将比较先前的结果和更新的结果,以显示出具体的减少幅度,并说明遵循了哪些建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号