Named after former Montana Territorial Governor Samuel Thomas Hauser and founder of the Missouri River Power Company, Wisconsin Bridge and Iron Company constructed Hauser Dam from 1905 to 1907. The dam impounded the Missouri River in a narrow canyon, about 20 miles northeast of the Capital City, Helena. The dam was 75 feet high and 630 feet long, with a spillway 500 feet wide and 13 feet deep. Construction materials for the dam consisted of a combination of steel, sheet pile, masonry, and concrete on top of a foundation that varied from bedrock to alluvium. The powerhouse had 10 turbines that produced 14,000 kilowatts of power. At about 2:30 PM on April 14, 1908, a 300-foot wide section of the dam breached. The breach sent a 25 to 30 foot high wall of water downstream toward the construction site of the Holter Dam and the town of Craig. The flood wave would eventually reach the city of Great Falls, 70 miles to the North, while retaining a depth of about 7 feet. A combination of telephone calls from the dam site, telegrams, and a dispatched locomotive warned residents downstream of the immanent flood. Accounts credit these communication efforts with saving many lives. Despite major flooding at the Holter Dam construction site and in the towns of Craig and Ulm, no lives were lost. Damages from the flood reached over $1 million. United Missouri River Power reconstructed the dam from 1908 to 1911 as a concrete dam 80 feet high and 700 feet long. Northwestern Energy currently owns the dam, which produces 14,000 kilowatts of power.
机译:威斯康星桥和钢铁公司以蒙大拿州前州长塞缪尔·托马斯·豪瑟(Samuel Thomas Hauser)和密苏里河电力公司的创始人的名字命名,于1905年至1907年建造了豪瑟水坝。大坝将密苏里河绑在首都东北约20英里的狭窄峡谷中。 ,海伦娜。大坝高75英尺,长630英尺,溢洪道宽500英尺,深13英尺。大坝的建筑材料由钢,薄板桩,砖石和混凝土组成,其基础从基岩到冲积层不等。该发电站有10台涡轮机,可产生14,000千瓦的功率。 1908年4月14日下午2时30分左右,大坝的300英尺宽断了。突破口向下游的霍尔特水坝和克雷格(Craig)工地发送了25至30英尺高的水墙。洪水波最终将到达北面70英里处的大瀑布城,同时保持约7英尺的深度。大坝现场的电话,电报和调度的机车相结合,警告了洪水即将来临的下游居民。帐户将这些通信工作归功于挽救了许多生命。尽管在Holter大坝建设工地以及Craig和Ulm镇发生了大水灾,但没有人丧生。洪水造成的损失超过100万美元。密苏里河电力公司从1908年到1911年将水坝重建为80英尺高和700英尺长的混凝土水坝。美国西北能源公司目前拥有该大坝,该大坝可发电14,000千瓦。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号