The Florida Governmental Utility Authority (FGUA) is made up of 84 utility systems across 14 counties in the state. Systems range from a few connections to a few thousand connections and each comes with its own unique set of challenges. Recently, in the North Fort Myers system, the FGUA was faced with the problem of excess reuse water. The FGUA Del Prado Water Reclamation Facility (Del Prado) produces high quality reclaimed water that is then is delivered directly to wholesale customers - including the City of Cape Coral - for irrigation. Problems occur when excessive rain, along with decreased demand for irrigation water, causes the facility to have more reclaimed water than customers can use. Although an existing injection well is in place to provide supplemental disposal of reuse water, there are times when the amount of reuse water exceeds the combined demand plus disposal capacity of the well. This meant that excess reclaimed water was discharged onto the ground at the reclamation facility in cases of excessive rain events, creating a compliance issue. This presentation highlights the proposed solution by the FGUA to deal with the excess reuse water and meet Florida Department of Environmental Protection (FDEP) regulations, the challenges that occurred throughout the process and the final resolution to the situation.
机译:佛罗里达州政府公用事业局(FGUA)由该州14个县的84个公用事业系统组成。系统范围从几个连接到几千个连接,每个连接都有其独特的挑战。最近,在迈尔斯堡北部系统中,FGUA面临着过量回用水的问题。 FGUA Del Prado水回收设施(Del Prado)生产高质量的再生水,然后将其直接输送给批发客户(包括开普科勒尔市)进行灌溉。当雨水过多以及对灌溉水的需求减少,导致设施中的再生水超出客户的使用能力时,就会出现问题。尽管现有的注入井可以提供补充性的回用水处理,但有时回用水的数量超过了井的总需求加处理能力。这意味着在发生过多降雨的情况下,多余的再生水会在填海设施的地面上排泄,从而造成合规性问题。本演讲重点介绍了FGUA提出的解决方案,以处理过量的回用水并满足佛罗里达州环境保护局(FDEP)的法规,在整个过程中发生的挑战以及对情况的最终解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号