DeKalb County Department of Watershed Management (DWM) manages and maintains the water and wastewater assets of the County. During risk evaluations, emergency operations planning, and continuity of operations planning, DWM looked at potential impacts and risk related to people, pumps, pipes, electricity, flooding, etc. primarily during severe weather events. As a conscientious utility, DWM built reservoirs to ensure short term supply of water during adverse conditions that meant DWM built dams in the middle of a major metropolitan area with the inherent, but little understood, risks. During previous planning activities, DWM missed the greatest single threat to DWM, and our neighbors, Infrastructure - Dams. An Emergency Action Plan, or EAP, is a formal document that identifies potential emergency conditions at a dam and outlines procedures to follow to minimize damage and potential loss of life. The national average for dams with completed EAPs is 79%~i with some States addressing the issue through new regulations requiring owners of high hazard dams to develop and submit plans. When DWM developed the required EAPs, the extent of predicted damage from a dam failure was identified as catastrophic with a high probability of a large loss of life. The lack of awareness and planning became one of the highest risks to continuity of operation, not only from the three (3) DWM owned dams, but the additional fourteen (14) high hazard dams in the County, nine (9) of which are privately owned. Many of these dams are not actively maintained or inspected by the owners. This presentation strives to outline a new understanding of risk, often overlooked, by a utility. It will provide an overview of the issues surrounding dam ownership and detail how to evaluate the risks, successfully incorporate the risks into emergency planning, and then minimize the risks through operations and training.
机译:迪卡尔布县流域管理部门(DWM)管理和维护该县的水和废水资产。在风险评估,紧急行动计划和行动计划的连续性过程中,DWM主要在严重天气事件中研究了与人员,泵,管道,电力,洪水等有关的潜在影响和风险。作为认真的公用事业,DWM建造了水库以确保在不利条件下的短期供水,这意味着DWM在主要都会区的中部建造了水坝,但存在固有的风险,但鲜为人知。在先前的规划活动中,DWM错过了对DWM以及我们的邻居基础设施-大坝的最大单一威胁。紧急行动计划(EAP)是正式文件,可识别大坝的潜在紧急情况,并概述了为最大程度地减少损害和潜在生命损失而应遵循的程序。拥有完整EAP的大坝的全国平均水平为79%〜i,一些国家通过新法规解决了这一问题,新法规要求高危大坝所有者制定和提交计划。当DWM开发所需的EAP时,大坝故障造成的预计破坏程度被确定为灾难性事故,极有可能造成重大人员伤亡。缺乏意识和计划的缺乏成为运营连续性的最大风险之一,不仅是由DWM拥有的三(3)个大坝造成的,而且该县另外的十四(14)个高危大坝也受到威胁,其中九(9)个是私人拥有。这些水坝中的许多水坝没有得到业主的积极维护或检查。本演示文稿旨在概述对公用事业公司经常忽视的风险的新认识。它将概述有关大坝所有权的问题,并详细介绍如何评估风险,将风险成功纳入应急计划,然后通过运营和培训将风险降至最低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号