DELIVERING A NEW WATER SUPPLY TO UNION COUNTY, NORTH CAROLINA USING AN INTEGRATED DELIVERY MODEL

机译:使用集成的输送模型向北卡罗来纳州的联合县输送新的供水

获取原文

摘要

The Yadkin River Water Supply Project (YRWSP) is an effort by Union County, NC to meet the growing demand for water in the County's Yadkin River Basin Service Area. Union County has seen significant growth over the past two decades as a result of the expanding Charlotte metropolitan region. While Union County has proven to be an attractive place to live for new (and existing) residents, it does not have a major surface water supply source within it's county boundaries. Union County jointly owns a water treatment plant with the Lancaster County Water and Sewer District that utilizes the Catawba River for drinking water supply primarily to Catawba River Basin service area residents. However, Union County has a regulatory limit of only 5 million gallons per day (MGD) that they are allowed to transfer from this Catawba River source into their Yadkin River Basin service area. Year 2050 projections indicate a 'shortfall' of 28 MGD in maximum day demand in their Yadkin River Basin service area, which comprises more than half the county land area. Thus, the County has been working diligently on a long-term sustainable water supply for their current and future customers in the Yadkin River Basin service area. Since 2012, Union County has completed a complex Interlocal Intake and Transmission Agreement with the Town of Norwood and secured an Interbasin Transfer (IBT) Certificate from the North Carolina Environmental Management Commission. The IBT Certificate included four years of effort developing an Environmental Impact Statement, securing stakeholder input, and completing extensive modeling and preliminary engineering efforts. Completion of the Interlocal Intake and Transmission Agreement and the pursuit of the IBT Certificate were highlighted at a presentation at the 2016 WEF Utility Management Conference. The IBT Certificate was approved in May of 2016. In late 2016, Union County received Requests for Qualifications (RFQ) for an Owner's Engineer/Program Manager to assist Union County Public Works (UCPW) staff with the delivery of the YRWSP infrastructure. The Owner's Engineer/Program Manager is a role that is designed to serve as 'an extension of staff throughout the life of the projects that will comprise the YRWSP. HDR was selected as the UCPW's Program Manager. Based on current water demand projections, the YRWSP must be complete by the Year 2021. Given this aggressive timeline, the County desired to move forward with design and construction while the IBT certificate was in the final stages of review and approval. The YRWSP infrastructure program includes a new raw water intake (for both the Town of Norwood and Union County) adjacent to Lake Tillery, a 28-mile pipeline through Stanly County into Union County, a new 12-mgd water treatment plant in Union County, and 11-miles of finished water distribution infrastructure to convey treated water into the County's existing water distribution system. The overall project has a current cost opinion of $205 million. The County had a strong preference for delivery of this infrastructure in one or more projects using alternative delivery methods (e.g. design-build (D-B)). Given the scope, complexity, and fast-track nature of this project, the Program Manager's general scope of services includes: 1 Developing the overall program master schedule and suggested project delivery packages. 2 Coordinating design and construction efforts. 3 Developing necessary design standards and preliminary design concepts as required. 4 Managing the overall program budget. 5 Managing the coordination of overall project communications. 6 Defining the scope of services for various project participants. 7 Guiding the County in selection of D-B teams. 8 Assisting with the development of comprehensive agreements for D-B teams. 9 Assisting with the negotiation of D-B contracts and guaranteed maximum prices (GMP) 10 Monitoring the design contract including technical reviews and design/cost/schedule control. 11 Developing opinions of probable construction costs (OPCCs). 12 Monitoring and administering construction contracts. 13 Coordinating overall permitting efforts. 14 Leading the land acquisition efforts. 15 Coordinating SCADA systems and planning. 16 Providing value engineering services. 17 Developing Building Information Modeling (3-D design) standards and coordinating with D-B Teams to facilitate UCPWs long-term asset management program goals. 18 Coordinating with the Town of Norwood and Stanly County, including quarterly Board meeting updates with the Town. This paper focuses on the process used by Union County to determine 'how' to package the infrastructure projects and 'what' integrated delivery model to use. The use of integrated delivery has become more popular in the last few years as recent statutory changes made it easier to utilize these methods for public infrastructure projects, particularly in NC.
机译:Yadkin河供水项目(YRWSP)是联合县,NC的努力,以满足县城亚岱金河流域服务区对水不断增长的需求。由于扩大夏洛特大都市地区,联盟县在过去二十年中出现了显着的增长。虽然联盟县已被证明是为新(和现有)居民而居住的有吸引力的地方,但它在其县域边界内没有主要的地表供水来源。 Union County共同拥有水处理厂与兰开斯特县水和下水道区,利用Catawba River用于饮用水供应,主要用于Catawba River流域服务区居民。然而,联盟县的监管限额仅为每天500万加仑(MGD),以至于它们被允许从此Catawba河源转移到他们的Yadkin河流域服务区。 2050年预测表明,在其Yadkin河流域服务区的最大需求中表明28 MGD的“缺口”,其中包括县城面积的一半以上。因此,该县一直在努力为其当前和未来客户在Yadkin河流域服务区的长期可持续供水。自2012年以来,联盟县与诺伍德镇完成了复杂的跨场摄入和传输协议,并获得了北卡罗来纳州环境管理委员会的互联网转移(IBT)证书。 IBT证书包括四年努力,制定环境影响声明,确保利益攸关方输入,并完成广泛的建模和初步工程努力。 2016年WEF公用事业管理会议的介绍,突出了跨分析进口和传输协议和追求IBT证书。 IBT证书于2016年5月批准。2016年底,联盟县收到了所有者的工程师/计划经理的资格(RFQ)请求,以协助联盟县公共工程(UCPW)工作人员提供YRWSP基础设施。业主的工程师/计划管理器是旨在作为“整个项目的员工延伸,这将包括YRWSP的项目。 HDR被选为UCPW的计划经理。基于当前的水需求预测,YRWSP必须完成2021年。鉴于这种激进的时间表,该县希望在IBT证书处于审查和批准的最终阶段。 YRWSP基础设施计划包括新的原水摄入量(对于诺伍德和联盟县城),毗邻湖耕地,一个28英里的管道,通过斯坦利县成为联合县的新款12 Mgd水处理厂, 11英里的成品分配基础设施,将处理过的水传达到县的现有水分配系统中。整体项目的当前成本意见为2.05亿美元。该县利用替代交付方法在一个或多个项目中交付此基础设施的强烈偏好(例如,设计 - 构建(D-B))。鉴于该项目的范围,复杂性和快速跟踪性质,计划经理的一般服务范围包括:1开发整体计划主计划和建议的项目交付包。 2协调设计与施工努力。 3根据需要制定必要的设计标准和初步设计概念。 4管理整体计划预算。 5管理整体项目通信的协调。 6定义各种项目参与者的服务范围。 7指导该县选择D-B团队。 8协助开发D-B团队的全面协议。 9协助谈判D-B合同并保证最高价格(GMP)10监控设计合同,包括技术审查和设计/成本/进度控制。 11制定可能的建筑成本(OPCC)的意见。 12监测和管理施工合同。 13协调整体允许努力。 14领导土地收购努力。 15协调SCADA系统和规划。 16提供价值工程服务。 17开发建筑信息建模(3-D设计)标准和与D-B团队协调,以方便UCPWS长期资产管理计划目标。 18与诺伍德和斯坦利县的镇协调,包括与镇上的季度会议更新。本文重点介绍了联合县使用的过程,以确定“如何”打包基础设施项目和“综合交付模型即可使用。在最近几年的情况下,在最近的法定变革中,使用综合交付使得更容易利用这些用于公共基础设施项目的方法,特别是在NC中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号