首页> 外文会议>Association of State Dam Safety Officials annual conference >Chicago Sanitary and Ship Canal at Lockport Rehabilitation Case Study
【24h】

Chicago Sanitary and Ship Canal at Lockport Rehabilitation Case Study

机译:洛克波特修复案例中的芝加哥卫生和船舶运河

获取原文

摘要

Construction of the Chicago Sanitary and Ship Canal (CSSC) (Figure 1) began in 1892 and the canal was opened in 1900. This was the first important work of the newly formed Sanitary District of Chicago [now the Metropolitan Water Reclamation District of Greater Chicago (MWRDGC)]. The CSSC began at the South Branch of the Chicago River at Robe Avenue (now Damen Avenue) and continued to the Controlling Works at Lockport, IL, a distance of approximately 30 miles. The river now flowed out of Lake Michigan, through the South Branch of the Chicago River, through the CSSC at Damen Avenue, through the Controlling Works and into the Des Plaines River at Lockport, ultimately flowing down the Illinois River to the Mississippi River.
机译:芝加哥卫生和船舶运河(CSSC)(图1)的建设始于1892年,运河于1900年开放。这是新成立的芝加哥卫生区(现为大芝加哥大都会水回收区)的第一项重要工作。 (MWRDGC)]。 CSSC始于芝加哥河南分支的罗布大街(Robe Avenue)(现为达门大街),一直延伸到伊利诺伊州洛克波特的控制工厂,距离约30英里。现在,这条河从密歇根湖流出,经过芝加哥河的南支流,经过达门大道的CSSC,经过控制工程,流入洛克波特的德斯普莱恩斯河,最终从伊利诺伊斯河流向密西西比河。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号