EMBALSE STEAM GENERATOR REPLACEMENT PROJECT: MAIN CHALLENGES AND PROGRESS UPDATE OF THE IMPLEMENTATION PHASE

机译:汽轮发电机更换项目:实施阶段的主要挑战和进展更新

获取原文

摘要

Following several years of planning and preparation, the Embalse NPP (Cordoba Province, Argentina), was shut down on December 31, 2015 to implement the execution phase of the Life Extension Project. The unit has been successfully defueled, drained and the reactor component replacement activities are advancing well. With this being the third CANDU6 retubing campaign, but the first one in implementing the steam generator replacement (SGR), the devices, processes and planning for the SGR have been developed to minimize impacts in the fuel channel replacement activity. This paper will provide an overview of the Embalse SGR activities with particular emphasis on planning & engineering, and the first of the kind for rigging & handling and fitting process in a CANDU 6 plant. Progress of tasks already implemented up to April 2017 and main challenges faced will also be described.
机译:经过数年的规划和准备,Embalse NPP(阿根廷科尔多瓦省)于2015年12月31日关闭,以实施“延寿项目”的执行阶段。该装置已成功加油,排干,反应堆组件的更换工作进展顺利。这是第三次CANDU6换管活动,但也是实施蒸汽发生器更换(SGR)的第一个活动,已经开发了SGR的设备,工艺和计划,以最大程度地减少对燃料通道更换活动的影响。本文将提供Embalse SGR活动的概述,尤其是规划和工程,这是CANDU 6工厂中第一个用于装配,搬运和装配过程的活动。还将描述截至2017年4月已经执行的任务的进度以及面临的主要挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号