首页> 外文会议>International conference on construction and real estate management >Risk Identification of Shield Tunnel Construction Based on Failure Knowledge
【24h】

Risk Identification of Shield Tunnel Construction Based on Failure Knowledge

机译:基于故障知识的盾构隧道施工风险识别

获取原文

摘要

Shield construction is a high-risk construction method for tunnel engineering, there are many uncertain factors. How to identify the risk factors accurately has become a hot topic among scholars. The existing risk identification methods mostly predict risks from the positive direction, it's inevitable that some risk factors will be omitted, affecting the integrity of the recognition results. This paper introduces the reverse thinking into risk identification, and proposes a new method of risk identification based on failure knowledge. First, turning failure into knowledge based on a threefold arrangement that includes: (1) investigate and collect failure; (2) use the failure knowledge form to describe failure; and (3) extract risk factors from failure by using FCTA approach. Then, adding the unknown risk factors through reverse thinking into the system of known risk factors. Finally, improving the process of risk identification combined with the characteristics of shield tunnel construction.
机译:盾构施工是隧道工程的高风险施工方法,存在许多不确定因素。如何准确识别危险因素已成为学者们关注的热点。现有的风险识别方法大多从正向预测风险,不可避免地会忽略一些风险因素,影响识别结果的完整性。本文将逆向思维引入风险识别中,提出了一种基于失效知识的风险识别新方法。首先,根据三重安排将失败转化为知识,包括:(1)调查并收集失败; (2)使用故障知识表来描述故障; (3)运用FCTA方法从失败中提取风险因素。然后,通过反向思考将未知风险因素添加到已知风险因素系统中。最后,结合盾构隧道施工特点,完善风险识别流程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号