首页> 外文会议>International conference on construction and real estate management >Major Barriers to Different Kinds of Prefabricated Public Housing in China: The Developers' Perspective
【24h】

Major Barriers to Different Kinds of Prefabricated Public Housing in China: The Developers' Perspective

机译:中国不同类型的预制公共住房的主要障碍:开发商的观点

获取原文

摘要

The Chinese government has enacted a series of policies and regulations to promote the development of prefabricated houses in recent years, including applying prefabricated construction to public housing as pilot projects. Prefabricated construction has been regarded as an effective means of enhancing construction quality and efficiency, but the implementation effect has not reached the expected objectives with regard to the prefabricated public housing in China. This paper aims to investigate major factors inhibiting the effective adoption of prefabricated construction to different kinds of public housing in China, including low-cost commercial residential house, public rental house, shantytowns transform house, and others. Ten critical factors were selected through literature review and classified into four groups, namely "governmental incentives," "industrial chain," "technology," and "cost." A questionnaire including obstacle factors and design, construction and management questions was sent out to developers of public housing in Beijing, China. There are 65 public housing pilot projects in total to investigate, and 45 project developers gave valid responses. Analytic hierarchy process (AHP) is used to identify the major barriers, concluding that "scale diseconomies due to inadequate level of standardization," "high cost compared to conventional construction," and "incomplete industry chain" are the top three obstacles. The paper also indicates that the most dominant barrier is cost with reference to prefabricated public housing in China from developers' perspective. While for public rental house, the primary barrier is industrial chain. These findings can help developers of different kinds of public housing to understand major barriers, and government to take on measures to reduce cost.
机译:近年来,中国政府颁布了一系列政策和法规,以促进预制房屋的发展,包括将预制房屋应用于公共住房的试点项目。预制建筑被认为是提高建筑质量和效率的有效手段,但是对于中国的预制公共房屋,实施效果尚未达到预期的目标。本文的目的是研究阻碍在中国各种公共住房中有效采用预制建筑的主要因素,包括低成本商品住宅,公共租赁房屋,棚户区改造房屋等。通过文献综述选择了十个关键因素,并将其分为“政府激励”,“产业链”,“技术”和“成本”四类。向中国北京的公共住房开发商发送了一份包括障碍因素以及设计,施工和管理问题的问卷。共有65个公共住房试点项目需要调查,有45个项目开发商给出了有效的回应。层次分析法(AHP)用于识别主要障碍,其结论是“由于标准化水平不足而导致规模不经济”,“与常规建筑相比成本较高”和“产业链不完整”是最主要的三个障碍。本文还指出,从开发商的角度来看,相对于中国的预制公共住房,最大的障碍是成本。对于公共租赁房屋而言,主要障碍是产业链。这些发现可以帮助各种公共住房的开发商了解主要障碍,并帮助政府采取措施降低成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号