首页> 外文会议>Smart Grid Conference >Optimal placement and charge/discharge scheduling of electric parking lots considering reactive power generation capability
【24h】

Optimal placement and charge/discharge scheduling of electric parking lots considering reactive power generation capability

机译:考虑无功发电能力的电动停车场的优化布局和充放电调度

获取原文

摘要

Increasing the number of electric parking lots (EPLs) in the distribution systems may have some important impacts on their performances. These impacts can improve or deteriorate the system's performance depending on the EPLs' charge/discharge scheduling (CDS), location and size of these resources. This paper presents an approach to firstly determine an appropriate charge/discharge scheduling for an EPL in a 24-hour time period. Secondly, the optimal location is specified for an EPL to reduce energy loss, improve voltage stability, and voltage profile considering the reactive power capability of the EPL's inverter. The proposed method is implemented on the IEEE 33-bus standard distribution system. The genetic algorithm and backward-forward power flow method are utilized to evaluate the effectiveness of the proposed method.
机译:配电系统中电动停车场(EPL)数量的增加可能对其性能产生某些重要影响。这些影响会根据EPL的充电/放电调度(CDS),这些资源的位置和大小来改善或降低系统性能。本文提出了一种方法,它首先为24小时内的EPL确定适当的充电/放电时间表。其次,考虑到EPL逆变器的无功功率能力,为EPL指定了最佳位置,以减少能量损失,提高电压稳定性和电压曲线。所提出的方法是在IEEE 33总线标准分配系统上实现的。利用遗传算法和后向潮流算法评估了该方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号