首页> 外文会议>International topical meeting on probabilistic safety assessment and analysis >EVALUATION OF THE CUMULATIVE IMPACT OF PENDING MODEL CHANGES TO ADDRESS MSPI FAQ 14-01 REQUIREMENTS
【24h】

EVALUATION OF THE CUMULATIVE IMPACT OF PENDING MODEL CHANGES TO ADDRESS MSPI FAQ 14-01 REQUIREMENTS

机译:评估模型更改对MSPI常见问题解答常见问题的影响14-01要求

获取原文

摘要

FAQ 14-01 to NEI 99-02 Rev. 7 (Regulatory Assessment Performance Indicator Guideline) was approved in 2014. The new guidelines require that pending model changes that cannot be incorporated into a revision to the site PRA model of record prior to the next reporting quarter should be assessed consistent with the PRA Configuration Control program. The guideline further states that the configuration control program supporting the MSPI should contain a process that ensures that the cumulative impact of pending changes is considered. Pending model changes to be considered for MSPI are those related to implemented plant design and operational changes, identified errors in the PRA model, and F&Os characterized as findings for designed ASME standard supporting requirements. The overall goal of a licensee in addressing this guideline is to ensure that all pending model changes are assessed for their impact on MSPI in an integrated fashion while at the same time limiting the analysis burden associated with this requirement. This paper describes the systematic approach developed for a single unit BWR for addressing these requirements. The approach utilized relies upon a robust screening evaluation to filter modeling issues that are not applicable to the requirement; the results of this screening evaluation are then incorporated into the PRA model configuration control database. Model changes that are found to be applicable are addressed in either a best-estimate or bounding fashion and are incorporated into a "working MSPI model". A quantification, which incorporates the integrated impact of these model changes, is then performed and the effect on the MSPI values is subsequently calculated.
机译:NEI 99-02修订版7(法规评估绩效指标指南)的FAQ 14-01于2014年获得批准。新指南要求,在下次修订之前,不能将待定的模型更改纳入对站点PRA记录模型的修订中。报告季度应评估为与PRA配置控制程序一致。该指南进一步指出,支持MSPI的配置控制程序应包含一个过程,以确保考虑到未决更改的累积影响。 MSPI要考虑的待定模型更改包括与已实施的工厂设计和运营更改,PRA模型中已识别的错误以及F&O(与设计的ASME标准支持要求相关的特征)相关的更改。被许可方遵循该指南的总体目标是确保以集成方式评估所有未决的模型更改对MSPI的影响,同时限制与此要求相关的分析负担。本文介绍了为满足这些要求而为单个机组BWR开发的系统方法。所采用的方法依靠强大的筛选评估来过滤不适用于需求的建模问题;然后,此筛选评估的结果将合并到PRA模型配置控制数据库中。被发现适用的模型更改以最佳估计或边界方式解决,并被合并到“工作的MSPI模型”中。然后执行合并这些模型更改的综合影响的量化,然后计算对MSPI值的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号