The Potential Failure Mode Analysis Does Fit All Sizes - The Foundation for a Successful Dam Safety Management Program

机译:潜在故障模式分析适合所有规模-成功的大坝安全管理计划的基础

获取原文
获取外文期刊封面目录资料

摘要

Small dam owners rightfully question whether a commonly accepted dam safety practice equally applies to their project. Sometimes they do and sometimes they do not. A Potential Failure Mode Analysis (PFMA) is one of those concepts that is familiar and widely accepted process within the larger dam safety community, but not always well understood among the smaller owners. Although the concepts are generally well understood among many, its use and application is highly variable across different agencies, owners, and consultants. Large government dam owners who routinely perform robust quantitative dam safety risk analyses clearly understand how to develop a detailed Potential Failure Mode (PFM). Other dam owners sometimes struggle with the usefulness of a PFMA and understanding all of the intricacies associated with developing a detailed PFM that will provide the best insight into the design, performance, and behavior of their dam, and how to apply PFMs to their dam safety program. Conducting a PFMA and developing PFMs is the foundation for providing input to strategic dam safety management activities and actions for inspection programs, surveillance and monitoring activities, emergency action planning, site investigations, engineering studies, risk management, and others, regardless of the size of the dam. Poorly developed, unclear, or confusing, and missing potential failure modes can result in focusing dam safety activities in lower priority areas and/or missing critical dam safety concerns altogether. This paper is intended for any size of dam to provide some insights from lessons learned in conducting and participating in PFMA sessions and reviewing PFMA reports. This paper also addresses some commonly asked questions such as, "how many PFMs do I need for my project, why do I need to separate out all my PFM descriptions, and how do I manage all these PFMs?" Disclaimer: The opinions expressed in this paper are those of the authors and do not represent official guidance or direction from the Federal Energy Regulatory Commission.
机译:小水坝业主理所当然地质疑普遍接受的大坝安全实践是否同样适用于他们的项目。有时他们这样做,有时却没有。潜在故障模式分析(PFMA)是大型水坝安全社区中熟悉且广为接受的过程之一,但在较小的所有者中并不总是容易理解。尽管通常在许多概念中都很好地理解了这些概念,但是其使用和应用在不同的机构,所有者和顾问之间变化很大。定期进行可靠的定量大坝安全风险分析的大型政府大坝所有者清楚地了解如何制定详细的潜在故障模式(PFM)。其他大坝所有者有时会为PFMA的有效性而苦苦挣扎,并理解与开发详细的PFM相关的所有复杂性,这些细节将提供对大坝的设计,性能和行为以及如何将PFM应用于大坝安全的最佳见解。程序。进行PFMA和制定PFM是为战略大坝安全管理活动和行动提供意见的基础,以用于检查计划,监视和监视活动,应急行动计划,现场调查,工程研究,风险管理等,无论其规模如何。大坝。不良的开发,不清楚的或令人困惑的以及潜在的失败模式可能会导致大坝安全活动集中在优先级较低的区域和/或完全失去对大坝安全的关注。本文适用于任何大小的水坝,目的是从进行和参与PFMA会议以及审查PFMA报告中汲取的经验教训提供一些见解。本文还解决了一些常见问题,例如:“我的项目需要多少个PFM,为什么我需要分离出所有PFM描述,以及如何管理所有这些PFM?”免责声明:本文中表达的观点仅为作者的观点,并不代表美国联邦能源管理委员会的官方指导或指示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号