The value-analytical development of a generation of textile machines - The importance of having a methodological approach, even during the implementation phase of a value-

机译:一代纺织机器的价值分析发展-即使在价值实施阶段,采用方法学方法的重要性-

获取原文

摘要

MAHLO GmbH & Co. KG is a medium-sized company headquartered in Saal (Donau) in Lower Bavaria, Germany. With approximately 250 employees, MAHLO has developed, produced and marketed straightening, processing and quality-control systems for web- or sheet-form media, such as textiles and nonwovens, for a wide range of customer requirements. The company has been active for 70 years now. MAHLO's management decided to use value analysis for re-engineering the RVMC line of straightening systems in order to systematically ensure the product's future viability and competitiveness. Alongside aiming to significantly reduce production costs, an important project goal was to develop a new generation of machines whose properties will correspond to customer requirements over the next ten years. In the process, the interrelationships of the assemblies being used throughout the whole MAHLO spectrum of products had to be taken into account. The project scope had to also account for overcoming the substantial expenses associated with implementing the new product line. The implementation phase encompassed the following steps: 1. Implementing technical measures identified in the design phase while taking into account both target cost and customer requirements. 2. Managing projects and capacity, scheduling 3. Introducing an "interim generation" in order to achieve initial cost reductions and establish new technologies in the market 4. Managing the goods-in and goods-out processes for the products in the line. Both in the design and implementation phases, the approach taken followed value-analysis methodology: 1. Working in interdisciplinary teams with periodic support from specialists 2. Collecting and analyzing customer-relevant requirements 3. Compiling and evaluating information on the competition 4. Surveying specialists 5. Performing functional and functional cost analyses, in part to prioritize idea generation (cost-driver functions) 6. Searching for ideas in the functions 7. Evaluating ideas and converting them into measures 8. Combining measures with new designs accepted by the customer 9. Implementing measures to support the project, to the extent possible In the design phase nearly 250 individual measures were developed. Of these measures, two designs for a multistage implementation of the new machine generation were developed and proposed for implementation. Within the framework of overall project management, a milestone plan was put in place. This also supports the actions necessary for implementing this new machine generation. Particular focus was placed on testing new technologies in field tests for selected customers. In introducing the new machine generation, all other corporate functions were systematically integrated into a special implementation plan. Management evaluated the project very positively, not only with respect to cost savings but also in relation to how an interdisciplinary project would affect the corporate culture. Here, too, the project work resulted in a building block for safeguarding the company's future success. It will certainly not be the last of its kind at MAHLO.
机译:MAHLO GmbH&Co. KG是一家中型公司,总部位于德国下巴伐利亚行政区的萨尔(Donau)。 MAHLO拥有大约250名员工,已经开发,生产和销售了用于网状或片状介质(如纺织品和非织造布)的矫直,加工和质量控制系统,可满足广泛的客户需求。该公司已经活跃了70年。 MAHLO的管理层决定使用价值分析来重新设计RVMC矫直系统线,以便系统地确保产品的未来生存能力和竞争力。除了显着降低生产成本外,一个重要的项目目标是开发新一代机器,其性能将在未来十年内满足客户的需求。在此过程中,必须考虑在整个MAHLO产品系列中使用的组件之间的相互关系。项目范围还必须解决与实施新产品线相关的大量费用。实施阶段包括以下步骤:1.实施设计阶段确定的技术措施,同时考虑目标成本和客户需求。 2.管理项目和产能,安排时间表3.引入“临时代”以实现初始成本降低并在市场中建立新技术。4.管理生产线中产品的入库和出库流程。在设计和实施阶段,所采用的方法均遵循价值分析方法:1.在跨学科团队中工作,并得到专家的定期支持2.收集和分析与客户相关的需求3.汇编和评估有关竞争的信息4.勘测专家5.执行功能和功能成本分析,部分是为了优先考虑想法的产生(成本驱动程序功能)6.在功能中搜索想法7.评估想法并将其转换为度量标准8.将度量标准与客户接受的新设计结合起来9 。尽可能采取支持项目的措施在设计阶段,制定了近250项单独措施。在这些措施中,为新一代机器的多阶段实施开发了两种设计,并提出了实施方案。在总体项目管理的框架内,制定了一个里程碑计划。这也支持实现此新一代机器所需的操作。尤其着重于为选定的客户在现场测试中测试新技术。在介绍新一代机器时,所有其他公司功能已系统地集成到特殊的实施计划中。管理层不仅在节省成本方面,而且在跨学科项目将如何影响企业文化方面都对项目进行了积极的评价。在这里,项目工作也为维护公司未来的成功奠定了基础。它肯定不是MAHLO的同类产品中的最后一个。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号