首页> 外文会议>International Conference on Engineering, Technology and Innovation >Integration of project management with NPD process a metalworking company case study
【24h】

Integration of project management with NPD process a metalworking company case study

机译:将项目管理与NPD流程集成在一起-金属加工公司案例研究

获取原文

摘要

While the literature provides some reflection on the relation between Project Management and New Product Development (NPD), there are still doubts on how these practices can be integrated. This study made a contribution on how a metalworking company should integrate Project Management with their established NPD process. Additionally, a proposal about how the company should integrate the Subproject with the Global Project is made. Two main concerns guided the development of this work: the integrated project management process should be useful and easy to use. Therefore, only six main project management practices are proposed: project charter, initial project plan, progress reports, updated plan, open point list and lessons learned.
机译:尽管文献对项目管理和新产品开发(NPD)之间的关系提供了一些反思,但对于如何整合这些实践仍然存在疑问。这项研究为金属加工公司如何将项目管理与已建立的NPD流程相结合做出了贡献。此外,还提出了有关公司应如何将子项目与全球项目整合的建议。两个主要的问题指导了这项工作的发展:集成的项目管理过程应该是有用且易于使用的。因此,仅提出了六个主要的项目管理实践:项目章程,初始项目计划,进度报告,更新的计划,开放点列表和汲取的教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号